Difference between revisions of "Beam Test Meeting Mon. Mar. 12, 2012"

From GlueXWiki
Jump to: navigation, search
(Agenda)
m (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")
 
Line 3: Line 3:
 
# BCAL preparations
 
# BCAL preparations
 
## [[BCAL Beam Tests 2012#Photos_and_Plots | Assembly Photos]]
 
## [[BCAL Beam Tests 2012#Photos_and_Plots | Assembly Photos]]
## [https://halldweb1.jlab.org/elog-halld/SiPM/60 Electronics Update] (Fernando)
+
## [https://halldweb.jlab.org/elog-halld/SiPM/60 Electronics Update] (Fernando)
  
  

Latest revision as of 11:35, 31 March 2015

Agenda

  1. BCAL preparations
    1. Assembly Photos
    2. Electronics Update (Fernando)


Minutes

FCAL

- the slot 9 adc was not properly seated in the 3.3 Gev runs, it is seated now

BCAL

- gluing of the light guides is done, they are slightly over sized

- plan is to set up in 126 within a week and install in the hall on March 21

Hall A Calorimeter

- plan is to put in hall by Mar 14 and slide under tagger on March 21

General info

- Sergey, Alex, and John will characterize the energy of the 3 remote paddles under the tagger on the floor

- Hall will be at 5 pass for remainder of run except for a week with a global energy change at some future date