Beam Test Meeting Mon. Mar. 12, 2012

From GlueXWiki
Revision as of 11:35, 31 March 2015 by Marki (Talk | contribs) (Text replacement - "/halldweb1.jlab.org/" to "/halldweb.jlab.org/")

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

Agenda

  1. BCAL preparations
    1. Assembly Photos
    2. Electronics Update (Fernando)


Minutes

FCAL

- the slot 9 adc was not properly seated in the 3.3 Gev runs, it is seated now

BCAL

- gluing of the light guides is done, they are slightly over sized

- plan is to set up in 126 within a week and install in the hall on March 21

Hall A Calorimeter

- plan is to put in hall by Mar 14 and slide under tagger on March 21

General info

- Sergey, Alex, and John will characterize the energy of the 3 remote paddles under the tagger on the floor

- Hall will be at 5 pass for remainder of run except for a week with a global energy change at some future date