Difference between revisions of "Beam Test Meeting Mon. May. 07, 2012"
From GlueXWiki
Line 2: | Line 2: | ||
#* [[Media:Run491 histos.pdf]] Run 491 (Vbr=0.9 V) | #* [[Media:Run491 histos.pdf]] Run 491 (Vbr=0.9 V) | ||
#* [[Media:Run498 histos.pdf]] Run 498 (Vbr=1.2 V) | #* [[Media:Run498 histos.pdf]] Run 498 (Vbr=1.2 V) | ||
+ | # What gains do we want to run at? | ||
+ | #* Gain Ratio (from Andrei's plot): Vbr=0.9/Vbr=1.2 = 1800/2500 = 0.72 | ||
+ | #* Maximum ADC from downstream ch2 R491/R498 = 3300/4000 = 0.83 |
Revision as of 12:46, 7 May 2012
- Preliminary look at pulse heights and times (Elton)
- Media:Run491 histos.pdf Run 491 (Vbr=0.9 V)
- Media:Run498 histos.pdf Run 498 (Vbr=1.2 V)
- What gains do we want to run at?
- Gain Ratio (from Andrei's plot): Vbr=0.9/Vbr=1.2 = 1800/2500 = 0.72
- Maximum ADC from downstream ch2 R491/R498 = 3300/4000 = 0.83