Beam Test Meeting Mon. May. 07, 2012

From GlueXWiki
Revision as of 13:33, 7 May 2012 by Semenov (Talk | contribs)

Jump to: navigation, search
  1. Preliminary look at pulse heights and times (Elton)
  2. What gains do we want to run at?
    • Gain Ratio (from Andrei's plot): Vbr=0.9/Vbr=1.2 = 1800/2500 = 0.72
    • Maximum ADC from downstream ch2 R491/R498 = 3300/4000 = 0.83
  3. FADC range from Run 484: Vbr=1.2V (Andrei)