Difference between revisions of "CDC travel plans"
From GlueXWiki
(Created page with " The plan #Load up at CMU #Store truck indoors overnight #Drive to JLab ##Arrival before ?pm - go to EEL to unload ##Arrival after ? pm - go to Hall D, drive in, CDC in truck ove...") |
|||
Line 1: | Line 1: | ||
− | |||
The plan | The plan | ||
#Load up at CMU | #Load up at CMU | ||
Line 6: | Line 5: | ||
##Arrival before ?pm - go to EEL to unload | ##Arrival before ?pm - go to EEL to unload | ||
##Arrival after ? pm - go to Hall D, drive in, CDC in truck overnight, drive to EEL the next day and unload | ##Arrival after ? pm - go to Hall D, drive in, CDC in truck overnight, drive to EEL the next day and unload | ||
− | |||
Line 19: | Line 17: | ||
#Negotiate loading bay access | #Negotiate loading bay access | ||
#Check packing list, bring up to date | #Check packing list, bring up to date | ||
+ | #Book accommodation at resfac | ||
+ | |||
At JLab | At JLab |
Revision as of 15:36, 7 October 2013
The plan
- Load up at CMU
- Store truck indoors overnight
- Drive to JLab
- Arrival before ?pm - go to EEL to unload
- Arrival after ? pm - go to Hall D, drive in, CDC in truck overnight, drive to EEL the next day and unload
Preparations:
- Add reinforcements to CDC cart for forklift
- Order materials for reinforcements
- Calculate position of CDC's CM
- Order swivel wheels
- Swap straight wheels for swivel wheels
- Rent a truck
- Find somewhere to keep truck indoors overnight at CMU
- Negotiate loading bay access
- Check packing list, bring up to date
- Book accommodation at resfac
At JLab
- CDC is to be stored in EEL 126? until FDC installation is complete
- HV blocks need to be added
- CDC mini-readout in EEL can be set up once FDC has moved into Hall D
- Expect CDC installation to be in Jan 2014? (from engineering schedule)