Difference between revisions of "CDC travel plans"

From GlueXWiki
Jump to: navigation, search
Line 17: Line 17:
 
#Locate mooring snubbers
 
#Locate mooring snubbers
 
#Rent a truck
 
#Rent a truck
##Need to measure temp near CDC - buy long thermocouple?
+
##Need to measure temp near CDC - use long thermocouple
 
#Update packing list - extra things to bring (HVBs, manifold etc) [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2141 installation doc with packing list]
 
#Update packing list - extra things to bring (HVBs, manifold etc) [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=2141 installation doc with packing list]
 
#Book accommodation at resfac
 
#Book accommodation at resfac
Line 38: Line 38:
  
 
<h3>Shopping list</h3>
 
<h3>Shopping list</h3>
#Truck
+
#Truck - have a candidate
#Unistrut & fittings to modify cart
+
#Unistrut & fittings to modify cart - on order
#Swivel wheels
+
#Swivel wheels - on order
#Bubble wrap
+
#Bubble wrap - on order
#Filters for gas lines
+
#Filters for gas lines  
#Thermocouple?
+
#Thermocouple - done
 +
#Fan to distrib heat - on order
 
#Do we need to borrow a mini-compressor for the cart tires?
 
#Do we need to borrow a mini-compressor for the cart tires?

Revision as of 11:57, 8 October 2013

Overview

  1. Load up at CMU - looking at Oct 28-30 or Nov 4-6
  2. Ideally, store truck indoors overnight
  3. Drive to JLab
    1. Arrival before ?pm - go to EEL to unload
    2. Arrival after ? pm - go to Hall D, drive in, CDC in truck overnight, drive to EEL the next day and unload


Preparations

  1. Shopping list below
  2. Add reinforcements to CDC cart for forklift
    1. Calculate position of CDC's CM - Naomi - approx 20" from Al plate, will revise
  3. Swap straight wheels for swivel wheels
  4. Find filters to cap CDC gas tubes
  5. Wrap CDC in bubblewrap
  6. Cut dual-density foam to size
  7. Locate mooring snubbers
  8. Rent a truck
    1. Need to measure temp near CDC - use long thermocouple
  9. Update packing list - extra things to bring (HVBs, manifold etc) installation doc with packing list
  10. Book accommodation at resfac
  11. Find somewhere to keep truck indoors overnight at CMU - Naomi
  12. Negotiate loading bay access - Curtis
  13. Arrange time with fork lift driver - Gary


Equipment for readout

  1. 4 long scint paddles are to travel down from CMU
  2. Do we need to bring any NIM modules?


Longer term plans - after arrival at JLab

  1. CDC is to be stored in EEL 126? until FDC installation is complete
  2. HV blocks need to be added
  3. CDC mini-readout in EEL can be set up once FDC has moved into Hall D
  4. Expect CDC installation to be in Jan 2014 (engineering) or Dec 2013 (electronics) schedules are linked to installation meeting Sept 27


Shopping list

  1. Truck - have a candidate
  2. Unistrut & fittings to modify cart - on order
  3. Swivel wheels - on order
  4. Bubble wrap - on order
  5. Filters for gas lines
  6. Thermocouple - done
  7. Fan to distrib heat - on order
  8. Do we need to borrow a mini-compressor for the cart tires?