Difference between revisions of "CMU CLEAN ROOM"

From GlueXWiki
Jump to: navigation, search
(Early March, 2010)
(April 1, 2010 (no joke))
 
(9 intermediate revisions by the same user not shown)
Line 1: Line 1:
== Early March, 2010 ==
+
== April 1, 2010 (no joke) ==
 +
<table><tr>
 +
<td wdith=150>
 +
[[Image:To vestibule 0401 s.jpg|thumb|none|125px|View to the vestibule.]]
 +
</td><td width=150>
 +
[[Image:Cleanroom2 0401 s.jpg|thumb|none|125px|Construction corner.]]
 +
</td><td width=150>
 +
[[Image:Setup area2 0401 s.jpg|thumb|none|125px|Setup area outside clean room.]]
 +
</td></tr><tr><td>
 +
[[Image:Setup area 0401 s.jpg|thumb|none|125px|Setup area outside clean room.]]
 +
</td><td>
 +
[[Image:Cleanroom 0401 s.jpg|thumb|none|125px|Inside the clean room.]]
 +
</td><td>
 +
[[Image:Through wall 0401 s.jpg|thumb|none|125px|Look through the plastic wall.]]
 +
</td></tr></table>
 +
 
 +
== March 10, 2010 ==
 +
<table><tr>
 +
<td wdith=150>
 
[[Image:Vestibule 0310 s.jpg|thumb|none|125px|Vestibule to clean room.]]
 
[[Image:Vestibule 0310 s.jpg|thumb|none|125px|Vestibule to clean room.]]
 +
</td><td width=150>
 
[[Image:To fume 0310 s.jpg|thumb|none|125px|From vestibule into clean room.]]
 
[[Image:To fume 0310 s.jpg|thumb|none|125px|From vestibule into clean room.]]
 +
</td><td width=150>
 +
[[Image:Scaffold 0310 s.jpg|thumb|none|125px|Stringing area with scaffold.]]
 +
</td></tr><tr>
 +
<td>
 +
[[Image:Pass thru 0310 s.jpg|thumb|none|125px|From clean room back to vestibule.]]
 +
</td><td>
 +
[[Image:Fume hood 0310 s.jpg|thumb|none|125px|Fume hood in clean room.]]
 +
</td><td>
 +
[[Image:Cupboards 0310 s.jpg|thumb|none|125px|Storage space in clean room.]]
 +
</td></tr><tr>
 +
<td>
 +
[[Image:Gas reg 0310 s.jpg|thumb|none|125px|Filtered compressed air.]]
 +
</td>
 +
</tr>
 +
</table>

Latest revision as of 15:29, 1 April 2010

April 1, 2010 (no joke)

View to the vestibule.
Construction corner.
Setup area outside clean room.
Setup area outside clean room.
Inside the clean room.
Look through the plastic wall.

March 10, 2010

Vestibule to clean room.
From vestibule into clean room.
Stringing area with scaffold.
From clean room back to vestibule.
Fume hood in clean room.
Storage space in clean room.
Filtered compressed air.