CMU CLEAN ROOM

From GlueXWiki
Revision as of 15:29, 1 April 2010 by Cmeyer (Talk | contribs) (April 1, 2010 (no joke))

(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to: navigation, search

April 1, 2010 (no joke)

View to the vestibule.
Construction corner.
Setup area outside clean room.
Setup area outside clean room.
Inside the clean room.
Look through the plastic wall.

March 10, 2010

Vestibule to clean room.
From vestibule into clean room.
Stringing area with scaffold.
From clean room back to vestibule.
Fume hood in clean room.
Storage space in clean room.
Filtered compressed air.