Difference between revisions of "CPP Test 2020 - Schedule"

From GlueXWiki
Jump to: navigation, search
(Detector configurations)
(Test layout)
Line 12: Line 12:
 
* Radiator Diamond JD70-105 47 um, Peak at 6 GeV
 
* Radiator Diamond JD70-105 47 um, Peak at 6 GeV
  
= Test layout =
+
== Test layout ==
  
 
  Screenshots of test layout [[media:CPP_Testconfig.jpg]]  [[media:CPP_Testconfig2.jpg]]
 
  Screenshots of test layout [[media:CPP_Testconfig.jpg]]  [[media:CPP_Testconfig2.jpg]]
Line 18: Line 18:
 
  [[media:CPP_Testconfig5.jpg]]  [[media:CPP_Testconfig6.jpg]]
 
  [[media:CPP_Testconfig5.jpg]]  [[media:CPP_Testconfig6.jpg]]
  
* Possible test schedule by Tim [[Media:CPP_Tests_Aug2020.pdf]]
+
== Test sequence ==
 +
=== Possible test schedule by Tim [[Media:CPP_Tests_Aug2020.pdf]] ===
  
CPP Preliminary baseline measurements. These will be conducted by Ilya during Fri Aug 28 4am-10am shift.
+
=== CPP Preliminary baseline measurements===
 +
 
 +
These will be conducted by Ilya during Fri Aug 28 4am-10am shift.
 
# CPP test DAQ setup: 2 hrs
 
# CPP test DAQ setup: 2 hrs
 
# Set coherent peak to 6 GeV
 
# Set coherent peak to 6 GeV
Line 28: Line 31:
 
# Restore coherent peak to 8.6 GeV
 
# Restore coherent peak to 8.6 GeV
  
Pass change for Hall A/C Day Mon Aug 31
+
=== Installation/setup of CPP Test ===
 +
# Pass change for Hall A/C Day Mon Aug 31
 
# Configure experiment for CPP Test: 12 hr. Mark Stevens and staff.
 
# Configure experiment for CPP Test: 12 hr. Mark Stevens and staff.
 
# Training for Pb sheet install/removal?
 
# Training for Pb sheet install/removal?
  
CPP Test. Mon evening Aug 31 - Tue morning Sep 1  
+
=== CPP Test. Mon evening Aug 31 - Tue morning Sep 1 ===
 
# Fill Target :
 
# Fill Target :
 
# Install 1 Pb sheet: 1 hr
 
# Install 1 Pb sheet: 1 hr
Line 48: Line 52:
 
# Data CPP Test Configuration - Empty Target/no DIRC/2Pb : 1 hr
 
# Data CPP Test Configuration - Empty Target/no DIRC/2Pb : 1 hr
  
Restore GlueX configuration and prepare for GEM-TRD Test. Tue day Sep 1
+
=== Restore GlueX configuration and prepare for GEM-TRD Test. Tue day Sep 1 ===
 
# Fill Target
 
# Fill Target
 
# Restore nominal GlueX configuration: 4 hours.
 
# Restore nominal GlueX configuration: 4 hours.
Line 54: Line 58:
 
Total time = 34 hours
 
Total time = 34 hours
  
Required personnel:
+
=== Required personnel ===
* Will 2 persons to install/remove Pb Sheets
+
# Two persons needed to install/remove Pb Sheets
* Mark Dalton has volunteered to come in on Monday evening if a third person is required to monitor the target.
+
# Mark Dalton has volunteered to come in on Monday evening if a third person is required to monitor the target.
  
 
{| class="wikitable"
 
{| class="wikitable"
Line 70: Line 74:
 
|}
 
|}
  
Additional notes:
+
== Additional notes ==
 
* The DIRC will have to be surveyed following the test.
 
* The DIRC will have to be surveyed following the test.

Revision as of 10:09, 28 August 2020

Detector configurations

Nominal GlueX configuration

  • No Pb shielding
  • DIRC installed
  • Solenoid field at 1350 A
  • Radiator Diamond JD70-105 47 um, Peak at 8.6 GeV

CPP Test Configuration

  • With and without Pb shielding
  • DIRC removed
  • Solenoid field at 1350 A (no change)
  • Radiator Diamond JD70-105 47 um, Peak at 6 GeV

Test layout

Screenshots of test layout media:CPP_Testconfig.jpg  media:CPP_Testconfig2.jpg
media:CPP_Testconfig3.jpg  media:CPP_Testconfig4.jpg 
media:CPP_Testconfig5.jpg  media:CPP_Testconfig6.jpg

Test sequence

Possible test schedule by Tim Media:CPP_Tests_Aug2020.pdf

CPP Preliminary baseline measurements

These will be conducted by Ilya during Fri Aug 28 4am-10am shift.

  1. CPP test DAQ setup: 2 hrs
  2. Set coherent peak to 6 GeV
  3. Data GlueX configuration - Full Target/DIRC (repeat from Dec 2019): 2 hrs
  4. Empty target : 1 hr
  5. Data GlueX configuration - Empty Target/DIRC : 1 hr
  6. Restore coherent peak to 8.6 GeV

Installation/setup of CPP Test

  1. Pass change for Hall A/C Day Mon Aug 31
  2. Configure experiment for CPP Test: 12 hr. Mark Stevens and staff.
  3. Training for Pb sheet install/removal?

CPP Test. Mon evening Aug 31 - Tue morning Sep 1

  1. Fill Target :
  2. Install 1 Pb sheet: 1 hr
  3. Data CPP Test configuration- Full Target/no DIRC/1Pb : 1 hr
  4. Install 0 Pb sheet: 1 hr
  5. Data CPP Test Configuration - Full Target/no DIRC/ 0Pb : 1 hr
  6. Install 2 Pb sheets: 1 hr
  7. Data CPP Test Configuration - Full Target/no DIRC/2Pb : 1 hr
  8. Empty Target :
  9. Install 1 Pb sheet: 1 hr
  10. Data CPP Test configuration- Empty Target/no DIRC/1Pb : 1 hr
  11. Install 0 Pb sheet: 1 hr
  12. Data CPP Test Configuration - Empty Target/no DIRC/0Pb : 1 hr
  13. Install 2 Pb sheets: 1 hr
  14. Data CPP Test Configuration - Empty Target/no DIRC/2Pb : 1 hr

Restore GlueX configuration and prepare for GEM-TRD Test. Tue day Sep 1

  1. Fill Target
  2. Restore nominal GlueX configuration: 4 hours.

Total time = 34 hours

Required personnel

  1. Two persons needed to install/remove Pb Sheets
  2. Mark Dalton has volunteered to come in on Monday evening if a third person is required to monitor the target.
Tentative Shift Schedule
Date Shift Worker CPP
Mon Aug 31 4 pm - 10 pm T. Britton D. Lawrence
Mon Aug 31 10 pm - 4 am S. Furletov I. Larin
Tue Sep 01 4 am - 10 am M. Khachatryan E. Smith

Additional notes

  • The DIRC will have to be surveyed following the test.