Difference between revisions of "CPP Test 2020 - Schedule"
From GlueXWiki
(→Detector configurations) |
(→Test layout) |
||
Line 12: | Line 12: | ||
* Radiator Diamond JD70-105 47 um, Peak at 6 GeV | * Radiator Diamond JD70-105 47 um, Peak at 6 GeV | ||
− | = Test layout = | + | == Test layout == |
Screenshots of test layout [[media:CPP_Testconfig.jpg]] [[media:CPP_Testconfig2.jpg]] | Screenshots of test layout [[media:CPP_Testconfig.jpg]] [[media:CPP_Testconfig2.jpg]] | ||
Line 18: | Line 18: | ||
[[media:CPP_Testconfig5.jpg]] [[media:CPP_Testconfig6.jpg]] | [[media:CPP_Testconfig5.jpg]] [[media:CPP_Testconfig6.jpg]] | ||
− | + | == Test sequence == | |
+ | === Possible test schedule by Tim [[Media:CPP_Tests_Aug2020.pdf]] === | ||
− | CPP Preliminary baseline measurements | + | === CPP Preliminary baseline measurements=== |
+ | |||
+ | These will be conducted by Ilya during Fri Aug 28 4am-10am shift. | ||
# CPP test DAQ setup: 2 hrs | # CPP test DAQ setup: 2 hrs | ||
# Set coherent peak to 6 GeV | # Set coherent peak to 6 GeV | ||
Line 28: | Line 31: | ||
# Restore coherent peak to 8.6 GeV | # Restore coherent peak to 8.6 GeV | ||
− | Pass change for Hall A/C Day Mon Aug 31 | + | === Installation/setup of CPP Test === |
+ | # Pass change for Hall A/C Day Mon Aug 31 | ||
# Configure experiment for CPP Test: 12 hr. Mark Stevens and staff. | # Configure experiment for CPP Test: 12 hr. Mark Stevens and staff. | ||
# Training for Pb sheet install/removal? | # Training for Pb sheet install/removal? | ||
− | CPP Test. Mon evening Aug 31 - Tue morning Sep 1 | + | === CPP Test. Mon evening Aug 31 - Tue morning Sep 1 === |
# Fill Target : | # Fill Target : | ||
# Install 1 Pb sheet: 1 hr | # Install 1 Pb sheet: 1 hr | ||
Line 48: | Line 52: | ||
# Data CPP Test Configuration - Empty Target/no DIRC/2Pb : 1 hr | # Data CPP Test Configuration - Empty Target/no DIRC/2Pb : 1 hr | ||
− | Restore GlueX configuration and prepare for GEM-TRD Test. Tue day Sep 1 | + | === Restore GlueX configuration and prepare for GEM-TRD Test. Tue day Sep 1 === |
# Fill Target | # Fill Target | ||
# Restore nominal GlueX configuration: 4 hours. | # Restore nominal GlueX configuration: 4 hours. | ||
Line 54: | Line 58: | ||
Total time = 34 hours | Total time = 34 hours | ||
− | Required personnel | + | === Required personnel === |
− | + | # Two persons needed to install/remove Pb Sheets | |
− | + | # Mark Dalton has volunteered to come in on Monday evening if a third person is required to monitor the target. | |
{| class="wikitable" | {| class="wikitable" | ||
Line 70: | Line 74: | ||
|} | |} | ||
− | Additional notes | + | == Additional notes == |
* The DIRC will have to be surveyed following the test. | * The DIRC will have to be surveyed following the test. |
Revision as of 10:09, 28 August 2020
Detector configurations
Nominal GlueX configuration
- No Pb shielding
- DIRC installed
- Solenoid field at 1350 A
- Radiator Diamond JD70-105 47 um, Peak at 8.6 GeV
CPP Test Configuration
- With and without Pb shielding
- DIRC removed
- Solenoid field at 1350 A (no change)
- Radiator Diamond JD70-105 47 um, Peak at 6 GeV
Test layout
Screenshots of test layout media:CPP_Testconfig.jpg media:CPP_Testconfig2.jpg media:CPP_Testconfig3.jpg media:CPP_Testconfig4.jpg media:CPP_Testconfig5.jpg media:CPP_Testconfig6.jpg
Test sequence
Possible test schedule by Tim Media:CPP_Tests_Aug2020.pdf
CPP Preliminary baseline measurements
These will be conducted by Ilya during Fri Aug 28 4am-10am shift.
- CPP test DAQ setup: 2 hrs
- Set coherent peak to 6 GeV
- Data GlueX configuration - Full Target/DIRC (repeat from Dec 2019): 2 hrs
- Empty target : 1 hr
- Data GlueX configuration - Empty Target/DIRC : 1 hr
- Restore coherent peak to 8.6 GeV
Installation/setup of CPP Test
- Pass change for Hall A/C Day Mon Aug 31
- Configure experiment for CPP Test: 12 hr. Mark Stevens and staff.
- Training for Pb sheet install/removal?
CPP Test. Mon evening Aug 31 - Tue morning Sep 1
- Fill Target :
- Install 1 Pb sheet: 1 hr
- Data CPP Test configuration- Full Target/no DIRC/1Pb : 1 hr
- Install 0 Pb sheet: 1 hr
- Data CPP Test Configuration - Full Target/no DIRC/ 0Pb : 1 hr
- Install 2 Pb sheets: 1 hr
- Data CPP Test Configuration - Full Target/no DIRC/2Pb : 1 hr
- Empty Target :
- Install 1 Pb sheet: 1 hr
- Data CPP Test configuration- Empty Target/no DIRC/1Pb : 1 hr
- Install 0 Pb sheet: 1 hr
- Data CPP Test Configuration - Empty Target/no DIRC/0Pb : 1 hr
- Install 2 Pb sheets: 1 hr
- Data CPP Test Configuration - Empty Target/no DIRC/2Pb : 1 hr
Restore GlueX configuration and prepare for GEM-TRD Test. Tue day Sep 1
- Fill Target
- Restore nominal GlueX configuration: 4 hours.
Total time = 34 hours
Required personnel
- Two persons needed to install/remove Pb Sheets
- Mark Dalton has volunteered to come in on Monday evening if a third person is required to monitor the target.
Date | Shift | Worker | CPP |
---|---|---|---|
Mon Aug 31 | 4 pm - 10 pm | T. Britton | D. Lawrence |
Mon Aug 31 | 10 pm - 4 am | S. Furletov | I. Larin |
Tue Sep 01 | 4 am - 10 am | M. Khachatryan | E. Smith |
Additional notes
- The DIRC will have to be surveyed following the test.