Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Documentation for Review)
(Documentation for Review)
Line 50: Line 50:
 
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4527 CPP Jeopardy Update PAC 48] June 22, 2020
 
# [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4527 CPP Jeopardy Update PAC 48] June 22, 2020
 
# OSP for muon chambers
 
# OSP for muon chambers
# Drawings for platform
+
# Drawings for support structure and iron absorbers
 
# Procedures for installation of muon detector
 
# Procedures for installation of muon detector

Revision as of 16:42, 3 December 2020

Preparations for the CPP and NPP Readiness Review

Draft Outline Presentations (Date?)

  • Charge
  • Reviewers
  • Agenda ***DRAFT***
    • 08:30-90:00 Executive session
    • 08:45-09:30 Overview of experiment and setup -- Rory Miskimen ?
    • 09:30-10:15 Engineering design and installation of the platform and muon chambers -- Tim Whitlatch ?
    • 10:15-10:45 Coffee break
    • 10:45-11:45 Project implementation, resources and schedule -- Elton Smith ?
    • 11:45-14:30 Lunch + Executive session
    • 14:30 Closeout
  • ERR Final Report
  • Addressing ERR Review Recommendations

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors

Platform Design

Trigger Discussion

Discussion topics with Sasha

  1. CPP / NPP plan is to run multiple TOF configuration files + FCAL trigger with possibly a lower threshold.
  2. Confirm that no new firmware is needed for the TOF, i.e. modifications for TOF only need different configuration files
  3. We would like to run the TOF trigger with multiple configuration files plus the FCAL trigger

References:

Documentation for Review

  1. CPP Jeopardy Presentation PAC 48 September 24, 2020
  2. CPP Jeopardy Update PAC 48 June 22, 2020
  3. OSP for muon chambers
  4. Drawings for support structure and iron absorbers
  5. Procedures for installation of muon detector