(Documentation for Review)
(Draft Outline Presentations (Feb 10))
Line 26: Line 26:
 
** 08:15-08:45 Executive session
 
** 08:15-08:45 Executive session
 
** 08:45-09:35 (30+20) Overview of experiment and setup (Charges: 1, 2. 5, 8) -- Rory Miskimen  
 
** 08:45-09:35 (30+20) Overview of experiment and setup (Charges: 1, 2. 5, 8) -- Rory Miskimen  
** 09:35-10:25 (30+20) Engineering design and installation of the platform and muon chambers  (Charges: 2, 3, 4) --  Tim Whitlatch  
+
** 09:35-10:25 (30+20) [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4903 Engineering Design, Fabrication, Operation and Installation of CPP Hardware] (Charges: 2, 3, 4) --  Tim Whitlatch  
 
** 10:25-10:45 Coffee break
 
** 10:25-10:45 Coffee break
 
** 10:45-11:15 (20+10) [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4898 Project implementation, resources and schedule] (Charges: 3, 6, 7, 9) -- Elton Smith
 
** 10:45-11:15 (20+10) [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4898 Project implementation, resources and schedule] (Charges: 3, 6, 7, 9) -- Elton Smith

Revision as of 17:56, 5 February 2021

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Draft Outline Presentations (Feb 10)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)
  • ERR Final Report
  • Addressing ERR Review Recommendations

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Documentation for Review

  1. PAC Documents
  2. TOF Trigger
  3. Draft Documents
  4. Released Drawings
  5. Installation Schedule
  6. Wiki Pages for further reference