Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Draft Outline Presentations (Feb 10))
(Documentation for Review)
Line 48: Line 48:
  
 
# PAC Documents
 
# PAC Documents
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4670 CPP Jeopardy Presentation PAC 48] September 24, 2020
+
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4670 CPP Jeopardy Presentation PAC 48] September 24, 2020
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4527 CPP Jeopardy Update PAC 48] June 22, 2020
+
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4527 CPP Jeopardy Update PAC 48] June 22, 2020
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4600 NPP Presentation to PAC 48] August 13, 2020
+
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4600 NPP Presentation to PAC 48] August 13, 2020
 
# TOF Trigger  
 
# TOF Trigger  
 
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4796 TOF trigger rate study with the upgraded TOF detector and optional lead shielding]  
 
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4796 TOF trigger rate study with the upgraded TOF detector and optional lead shielding]  

Revision as of 08:51, 8 February 2021

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Draft Outline Presentations (Feb 10)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)
  • ERR Final Report
  • Addressing ERR Review Recommendations

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Documentation for Review

  1. PAC Documents
  2. TOF Trigger
  3. Draft Documents
  4. Released Drawings
  5. Installation Schedule
  6. Wiki Pages for further reference