Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Documentation for Review)
(Documentation for Review)
Line 60: Line 60:
 
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/COO.pdf COO]
 
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/COO.pdf COO]
 
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ERG.pdf ERG]
 
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ERG.pdf ERG]
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ESAD.pdf ESAD]
+
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ESAD.pdf ESAD], [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/HallD_ESAD_mod.pdf ESAD version with muon detector]  
 
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/Draft_HallD_RSAD.pdf RSAD]
 
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/Draft_HallD_RSAD.pdf RSAD]
 
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/D00000-01-06-P006_RevB.docx FCAL Dark Room Procedure]
 
#* [https://userweb.jlab.org/~elton/ERR-CPP-NPP_docs/D00000-01-06-P006_RevB.docx FCAL Dark Room Procedure]

Revision as of 10:21, 8 February 2021

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Draft Outline Presentations (Feb 10)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)
  • ERR Final Report
  • Addressing ERR Review Recommendations

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Documentation for Review

  1. PAC Documents
  2. TOF Trigger
  3. Draft Documents
  4. Released Drawings
  5. Installation Schedule
  6. Wiki Pages for further reference