Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Report and Response)
(Report and Response)
Line 34: Line 34:
 
== Report and Response==
 
== Report and Response==
  
 +
=== Report ===
 
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4969 ERR Final Report, Feb 23, 2021]
 
* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4969 ERR Final Report, Feb 23, 2021]
 +
 +
=== Response 1 ===
 
* [https://halldweb.jlab.org/DocDB/0050/005079/002/HallD_CPP_NPP_ERR_v4_response.pdf Point-by-point Response]
 
* [https://halldweb.jlab.org/DocDB/0050/005079/002/HallD_CPP_NPP_ERR_v4_response.pdf Point-by-point Response]
 
* [https://halldweb.jlab.org/DocDB/0050/005079/002/Coarse_schedule.pdf Timelines and Responsibilities]
 
* [https://halldweb.jlab.org/DocDB/0050/005079/002/Coarse_schedule.pdf Timelines and Responsibilities]
 
* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=5080 Fabrication and Performance of the MWPC] GlueX-doc-5080
 
* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=5080 Fabrication and Performance of the MWPC] GlueX-doc-5080
  
 +
=== Comments to Response 1 ===
 
* [[Media:ERR Comments1.png | ERR Committee comments to response 1]]
 
* [[Media:ERR Comments1.png | ERR Committee comments to response 1]]
  

Revision as of 10:49, 11 May 2021

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Outline Presentations (February 10, 2021)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)

Report and Response

Report

Response 1

Comments to Response 1

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Documentation for Review

  1. PAC Documents
  2. TOF Trigger
  3. Draft Documents
  4. Released Drawings
  5. Installation Schedule
  6. Wiki Pages for further reference