Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Response 2)
(Response 2)
Line 47: Line 47:
 
=== Response 2 ===
 
=== Response 2 ===
 
# MWPC Efficiency
 
# MWPC Efficiency
#* [[Media:HallD CPP NPP ERR response2.pdf | Response to parts A, B and C]]
+
#* [[https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=5079 Response to parts A, B and C]]
 
# Schedule Status
 
# Schedule Status
 
#* [[Media:CPP-NPP schedule status2.png | CPP-NPP Schedule Status 5/11/2021]]. The following two references show that the new hdgeant4 simulation is operational and working:
 
#* [[Media:CPP-NPP schedule status2.png | CPP-NPP Schedule Status 5/11/2021]]. The following two references show that the new hdgeant4 simulation is operational and working:

Revision as of 16:05, 24 May 2021

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Outline Presentations (February 10, 2021)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)

Report and Response

Report

Response 1

Comments to Response 1

Response 2

  1. MWPC Efficiency
  2. Schedule Status

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Documentation for Review

  1. PAC Documents
  2. TOF Trigger
  3. Draft Documents
  4. Released Drawings
  5. Installation Schedule
  6. Wiki Pages for further reference