Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Response 2)
(Report and Response)
(10 intermediate revisions by the same user not shown)
Line 46: Line 46:
  
 
=== Response 2 ===
 
=== Response 2 ===
* [[Media:CPP-NPP schedule status.png | CPP-NPP Schedule Status 5/11/2021]]
+
# MWPC Efficiency
* [https://logbooks.jlab.org/entry/3876633 Log Entry 3876633] Histogram of muon hits from hdgeant4 simulation.
+
#* [https://halldweb.jlab.org/DocDB/0050/005079/003/HallD_CPP_NPP_ERR_response2.pdf Response to parts A, B and C]
 +
# Schedule Status
 +
#* [[Media:CPP-NPP schedule status2.png | CPP-NPP Schedule Status 5/11/2021]]. The following two references show that the new hdgeant4 simulation is operational and working:
 +
#* [https://logbooks.jlab.org/entry/3876633 Log Entry 3876633] Histogram of muon hits from hdgeant4 simulation.
 +
#* [[Tracking / extrapolation to MWPCs]] Preliminary studies of extrapolation of FDC tracks to MWPCs
 +
 
 +
=== Comments to Response 2 ===
 +
* [[Media:ERR Comments2.png | ERR Committee comments to response 2]]
  
 
== Additions to Standard Equipment ==
 
== Additions to Standard Equipment ==

Revision as of 07:55, 16 June 2021

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Outline Presentations (February 10, 2021)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)

Report and Response

Report

Response 1

Comments to Response 1

Response 2

  1. MWPC Efficiency
  2. Schedule Status

Comments to Response 2

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Documentation for Review

  1. PAC Documents
  2. TOF Trigger
  3. Draft Documents
  4. Released Drawings
  5. Installation Schedule
  6. Wiki Pages for further reference