Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Report and Response)
(Comments to Response 2)
Line 55: Line 55:
 
=== Comments to Response 2 ===
 
=== Comments to Response 2 ===
 
* [[Media:ERR Comments2.png | ERR Committee comments to response 2]]
 
* [[Media:ERR Comments2.png | ERR Committee comments to response 2]]
 +
 +
=== Response 3 ===
 +
* Preliminary results from cosmic-ray test in EEL126
 +
* [https://logbooks.jlab.org/entry/3940051 Efficiency summary for Arwen and Denethor (retest)]
 +
* [https://logbooks.jlab.org/entry/3932878 Efficiency summaries for all chambers]
 +
* [https://logbooks.jlab.org/entry/3937367 Arwen R188 analysis and voltage scan]
 +
* [https://logbooks.jlab.org/entry/3929607 Bilbo R166 and Celeborn R169 analysis]
 +
* [https://logbooks.jlab.org/entry/3936817 Denethor analysis R184]
 +
* [https://logbooks.jlab.org/entry/3932758 Eowyn analysis R171]
 +
* [https://logbooks.jlab.org/entry/3932293 Frodo analysis R175]
 +
* [https://logbooks.jlab.org/entry/3922895 Galadriel analysis R157]
  
 
== Additions to Standard Equipment ==
 
== Additions to Standard Equipment ==

Revision as of 16:31, 10 November 2021

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Outline Presentations (February 10, 2021)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)

Report and Response

Report

Response 1

Comments to Response 1

Response 2

  1. MWPC Efficiency
  2. Schedule Status

Comments to Response 2

Response 3

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Documentation for Review

  1. PAC Documents
  2. TOF Trigger
  3. Draft Documents
  4. Released Drawings
  5. Installation Schedule
  6. Wiki Pages for further reference