Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Documentation for Review)
(Documentation for Review)
Line 51: Line 51:
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4527 CPP Jeopardy Update PAC 48] June 22, 2020
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4527 CPP Jeopardy Update PAC 48] June 22, 2020
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4600 NPP Presentation to PAC 48] August 13, 2020
 
#* [https://halldweb.jlab.org/doc-private/DocDB/ShowDocument?docid=4600 NPP Presentation to PAC 48] August 13, 2020
# Wiki Pages
 
#* [[Charged Pion Polarizability Experiment in Hall-D | CPP wiki page]]
 
#* [[Pi0 Polarizability | NPP wiki page]]
 
 
# TOF Trigger  
 
# TOF Trigger  
 
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4796 TOF trigger rate study with the upgraded TOF detector and optional lead shielding]  
 
#* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=4796 TOF trigger rate study with the upgraded TOF detector and optional lead shielding]  
Line 68: Line 65:
 
# Drawings for support structure and iron absorbers
 
# Drawings for support structure and iron absorbers
 
# Procedures for installation of muon detector
 
# Procedures for installation of muon detector
 +
# Wiki Pages for further reference
 +
#* [[Charged Pion Polarizability Experiment in Hall-D | CPP wiki page]]
 +
#* [[Pi0 Polarizability | NPP wiki page]]

Revision as of 17:04, 4 February 2021

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Draft Outline Presentations (Feb 10)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)
  • Agenda
    • 08:15-08:45 Executive session
    • 08:45-09:35 (30+20) Overview of experiment and setup (Charges: 1, 2. 5, 8) -- Rory Miskimen
    • 09:35-10:25 (30+20) Engineering design and installation of the platform and muon chambers (Charges: 2, 3, 4) -- Tim Whitlatch
    • 10:25-10:45 Coffee break
    • 10:45-11:15 (20+10) Project implementation, resources and schedule (Charges: 3, 6, 7, 9) -- Elton Smith
    • 11:15-14:30 Lunch and Executive Session
    • 14:30 Closeout
  • ERR Final Report
  • Addressing ERR Review Recommendations

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Documentation for Review

  1. PAC Documents
  2. TOF Trigger
  3. Draft Documents
  4. Drawings for support structure and iron absorbers
  5. Procedures for installation of muon detector
  6. Wiki Pages for further reference