Difference between revisions of "CPP and NPP Readiness Review"

From GlueXWiki
Jump to: navigation, search
(Outline Presentations (February 10, 2021))
(Outline Presentations (February 10, 2021))
Line 35: Line 35:
 
* Point-by-point Response
 
* Point-by-point Response
 
* Timelines and Responsibilities
 
* Timelines and Responsibilities
* Fabrication and Performance of the MWPC
+
* [https://halldweb.jlab.org/doc-public/DocDB/ShowDocument?docid=5080 Fabrication and Performance of the MWPC] GlueX-doc-5080
  
 
== Additions to Standard Equipment ==
 
== Additions to Standard Equipment ==

Revision as of 10:37, 29 April 2021

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Outline Presentations (February 10, 2021)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Documentation for Review

  1. PAC Documents
  2. TOF Trigger
  3. Draft Documents
  4. Released Drawings
  5. Installation Schedule
  6. Wiki Pages for further reference