CPP and NPP Readiness Review

From GlueXWiki
Revision as of 16:55, 4 February 2021 by Elton (Talk | contribs) (Documentation for Review)

Jump to: navigation, search

Preparations for the CPP and NPP Readiness Review

Planning for Experiment

Draft Outline Presentations (Feb 10)

  • Reviewers:
    • Stepan Stepanyan (chair+muon detector)
    • Alexandre Cansonne (Trigger)
    • Brad Sawatzky (Tracking System -MWPC)
    • Chris Keith (Target)
    • Robin Wines (Installation)
    • Mikhail Kostin (RadCon)
    • Edy Nissen (Beamline)
    • Javier Gomez (Observer)
    • Ed Folts (Observer)
  • Agenda
    • 08:15-08:45 Executive session
    • 08:45-09:35 (30+20) Overview of experiment and setup (Charges: 1, 2. 5, 8) -- Rory Miskimen
    • 09:35-10:25 (30+20) Engineering design and installation of the platform and muon chambers (Charges: 2, 3, 4) -- Tim Whitlatch
    • 10:25-10:45 Coffee break
    • 10:45-11:15 (20+10) DRAFT: Project implementation, resources and schedule (Charges: 3, 6, 7, 9) -- Elton Smith
    • 11:15-14:30 Lunch and Executive Session
    • 14:30 Closeout
  • ERR Final Report
  • Addressing ERR Review Recommendations

Additions to Standard Equipment

The major modifications required to operate the experiment are the following

  • Design, fabrication and installation of the muon detector
    • Multi-wire proportional chambers
    • Modifications to the downstream platform, support structure and iron absorbers
  • New (mono-isotopic) solid Pb target
  • Charged-particle trigger based on the time-of-flight detectors
  • Move tagger microscope to cover 6 GeV coherent peak

Platform Design

Trigger Discussion

References:

Documentation for Review

  1. CPP Jeopardy Presentation PAC 48 September 24, 2020
  2. CPP Jeopardy Update PAC 48 June 22, 2020
  3. NPP Presentation to PAC 48 August 13, 2020
  4. CPP wiki page
  5. NPP wiki page
  6. Draft Documents
  7. Drawings for support structure and iron absorbers
  8. Procedures for installation of muon detector