Difference between revisions of "CPP and NPP Run Conditions"

From GlueXWiki
Jump to: navigation, search
Line 12: Line 12:
 
|style="text-align:left" | Run at higher current?
 
|style="text-align:left" | Run at higher current?
 
|-
 
|-
| style="text-align:left" | Diamond Alignment  ||  0.5? || 100 nA?  || Pb (0.3 mm) || 3.4 mm ||style="text-align:left" | JD70-103 and JD70-107  
+
| style="text-align:left" | Diamond Alignment  ||  0.5? || 20 nA?  || Pb (0.3 mm) || 3.4 mm ||style="text-align:left" | JD70-103 and JD70-107  
 
|style="text-align:left" |  
 
|style="text-align:left" |  
 
|-
 
|-

Revision as of 09:56, 15 March 2022

Time estimates for Run Plan
Activity Duration (PAC Days) Current Target Collimator Radiator Comment
Full target (Production) 20 27 nA Pb (0.3 mm) 3.4 mm JD70-103 or JD70-107 Alternate 0/90 deg diamond configuration
Empty Target 1.5? 27 nA - 3.4 mm JD70-103 or JD70-107 Run at higher current?
Diamond Alignment 0.5? 20 nA? Pb (0.3 mm) 3.4 mm JD70-103 and JD70-107
Trigger Commissioning 1.4? 100 nA? Pb (0.3 mm) 3.4 mm JD70-103 or JD70-107
Beam Energy Calibration 0.1? 100 nA Pb (0.3 mm) 3.4 mm JD70-103 or JD70-107 Collimator Blocking for 5 min, periodically
TAC Runs 1.5? <2 nA - 3.4 mm JD70-103 or JD70-107