(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Hall D FDC Readiness Review
March 31, 2011
Charge to the Committee
The scope of this review includes the fabrication requirements, design, and schedule of the Hall D FDC fabrication.