Difference between revisions of "Coil Test Weekly Meeting 11-Nov-2010"

From GlueXWiki
Jump to: navigation, search
m
m
Line 11: Line 11:
 
* Long term personnel outlook - Elliott
 
* Long term personnel outlook - Elliott
 
** tranfer of PLC programming responsibility
 
** tranfer of PLC programming responsibility
 +
 
* Experience with control system - All
 
* Experience with control system - All
 
** what have we learned, and is it written down?
 
** what have we learned, and is it written down?
Line 17: Line 18:
 
*** EWEB strip charts
 
*** EWEB strip charts
 
*** add missing sensors to EWEB pages
 
*** add missing sensors to EWEB pages
 +
*** add PID info
 +
 
* Preparation for powered operations - Elliott
 
* Preparation for powered operations - Elliott
 
** OSP, checklists, etc.
 
** OSP, checklists, etc.
Line 23: Line 26:
 
** fast DAQ, which channels, what rates?
 
** fast DAQ, which channels, what rates?
 
** rewire quench detector
 
** rewire quench detector
 +
** revisit fast/slow dump strategies - avoid fast dumps at all costs
 
** Hall probe
 
** Hall probe
 
** pickup coils
 
** pickup coils
Line 31: Line 35:
 
** broken/flaky sensors/gauges/instruments
 
** broken/flaky sensors/gauges/instruments
 
*** replace Pt sensor in heat exchanger with Si diode?
 
*** replace Pt sensor in heat exchanger with Si diode?
*** C-glass calibrations?
+
*** C-glass calibrations
 +
*** flat-lined Pt sensors
 
** vacuum valve interlock
 
** vacuum valve interlock
 
** what to do about strain gauges?
 
** what to do about strain gauges?
 +
 +
* Rdesktop/VNC policy and procedures - Yi, Josh
  
 
* PI Responsibilities during test - Jonathan
 
* PI Responsibilities during test - Jonathan
Line 49: Line 56:
 
* PLC operations - Mark W
 
* PLC operations - Mark W
 
** PID tuning, calibration, JT valve limits, etc.
 
** PID tuning, calibration, JT valve limits, etc.
 +
** Rework PID loop strategy
 
** magnet ramp down mechanism
 
** magnet ramp down mechanism
 
** UPS interlock
 
** UPS interlock
Line 56: Line 64:
 
** connection to guard shack and notification conditions
 
** connection to guard shack and notification conditions
 
** [[pager_status_10_21_2010 | pager status ]] and strategy
 
** [[pager_status_10_21_2010 | pager status ]] and strategy
 +
 
* HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
 
* HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes
 
** program access to archived data
 
** program access to archived data
 
** another tutorial
 
** another tutorial
 +
 +
* Elog experience - All
 +
** remember to enter your name!
 +
 
* Coil repair status - George
 
* Coil repair status - George
 +
** loose CF (ConFlat) flanges
 +
 
* Learn how to use Linux for web and email - Elliott
 
* Learn how to use Linux for web and email - Elliott
 +
 
* Solenoid review 7-Dec
 
* Solenoid review 7-Dec
 +
 
* Purchase of another PLC and Ethernet module - Elliott
 
* Purchase of another PLC and Ethernet module - Elliott
 +
 
* Hall D Technical web page
 
* Hall D Technical web page
 +
 
* Preparations for testing next coil - George, Scot, Elliott
 
* Preparations for testing next coil - George, Scot, Elliott
 
** update P&I
 
** update P&I

Revision as of 10:35, 9 November 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 4-Nov-2010 9:30 am ARC 428


Agenda

  • Long term personnel outlook - Elliott
    • tranfer of PLC programming responsibility
  • Experience with control system - All
    • what have we learned, and is it written down?
    • what will we do differently for the next coil?
    • what needs to be added/modified/improved?
      • EWEB strip charts
      • add missing sensors to EWEB pages
      • add PID info
  • Preparation for powered operations - Elliott
    • OSP, checklists, etc.
    • shunt installation/wiring, connection to interlock/control system
    • ground fault detection
    • fast DAQ, which channels, what rates?
    • rewire quench detector
    • revisit fast/slow dump strategies - avoid fast dumps at all costs
    • Hall probe
    • pickup coils
    • 240 V UPS on Danfysik control boards, main breaker
    • more redundancy?
    • interlock checkout
    • ODH on platform?
    • broken/flaky sensors/gauges/instruments
      • replace Pt sensor in heat exchanger with Si diode?
      • C-glass calibrations
      • flat-lined Pt sensors
    • vacuum valve interlock
    • what to do about strain gauges?
  • Rdesktop/VNC policy and procedures - Yi, Josh
  • PI Responsibilities during test - Jonathan
    • Low power magnet testing 5A, 50A,100A - Elliott
    • High power magnet testing 100-1500A - Elliott
    • Identify possible turn to turn shorts during ramping - Eugene
    • Assess Heim column centering in coil - George
    • Assess Axial column forces - George
    • Estimate LN2 and He heat leak - Jonathan
    • Assess LN2 and LHe thermal siphons - Jonathan
  • Controls racks - Scot
    • strain gauge and UPS interlocks
  • PLC operations - Mark W
    • PID tuning, calibration, JT valve limits, etc.
    • Rework PID loop strategy
    • magnet ramp down mechanism
    • UPS interlock
    • another tutorial
  • EPICS - Hovanes
    • connection to guard shack and notification conditions
    • pager status and strategy
  • HMI and EWEB programming - Yi, Hovanes
    • program access to archived data
    • another tutorial
  • Elog experience - All
    • remember to enter your name!
  • Coil repair status - George
    • loose CF (ConFlat) flanges
  • Learn how to use Linux for web and email - Elliott
  • Solenoid review 7-Dec
  • Purchase of another PLC and Ethernet module - Elliott
  • Hall D Technical web page
  • Preparations for testing next coil - George, Scot, Elliott
    • update P&I
    • splices
    • yoke location
    • piping adaptors
    • downstream yoke spacers
    • controls racks rewiring
    • quench detector connections
    • connectors on next coil
    • fix known problems
    • what else?