'''Agenda''' | '''Agenda''' | ||
+ | |||
+ | * Speeding up cooldown | ||
+ | ** can we use top fill somehow? | ||
+ | ** If not now, for the next coil? | ||
+ | |||
+ | * ODH on platform? | ||
+ | |||
+ | * Pager strategy - All | ||
+ | ** who has been carrying the pager? | ||
+ | ** are we ready to connect to the guard shack? | ||
* Long term personnel outlook - Elliott | * Long term personnel outlook - Elliott | ||
+ | ** tranfer of PLC programming responsibility | ||
+ | ** getting help, esp. for double shifts for removal/installation | ||
+ | ** losing help! | ||
+ | |||
* Experience with control system - All | * Experience with control system - All | ||
− | ** what have we learned, | + | ** what have we learned, is it written down? |
− | ** what will we do | + | ** what will we do differently for the next coil? |
** what needs to be added/modified/improved? | ** what needs to be added/modified/improved? | ||
*** EWEB strip charts | *** EWEB strip charts | ||
+ | *** add missing sensors to EWEB pages | ||
+ | *** add PID info | ||
+ | |||
* Preparation for powered operations - Elliott | * Preparation for powered operations - Elliott | ||
** OSP, checklists, etc. | ** OSP, checklists, etc. | ||
** shunt installation/wiring, connection to interlock/control system | ** shunt installation/wiring, connection to interlock/control system | ||
** ground fault detection | ** ground fault detection | ||
− | ** fast DAQ, which channels, what rates? | + | ** fast DAQ, which channels, what rates, how to coordinate time with PLC archive? |
− | ** rewire quench detector | + | ** rewire quench detector, how to balance channels? |
+ | ** revisit fast/slow dump strategies - avoid fast dumps at all costs | ||
** Hall probe | ** Hall probe | ||
** pickup coils | ** pickup coils | ||
− | ** | + | ** 230 V UPS on Danfysik control boards, main switch |
** more redundancy? | ** more redundancy? | ||
** interlock checkout | ** interlock checkout | ||
− | ** ODH on platform | + | ** ODH rating on platform and training |
** broken/flaky sensors/gauges/instruments | ** broken/flaky sensors/gauges/instruments | ||
*** replace Pt sensor in heat exchanger with Si diode? | *** replace Pt sensor in heat exchanger with Si diode? | ||
− | *** C-glass calibrations | + | *** C-glass calibrations |
− | ** vacuum valve interlock | + | *** flat-lined Pt sensors |
+ | ** vacuum gate valve interlock | ||
** what to do about strain gauges? | ** what to do about strain gauges? | ||
+ | ** what spares should we order? | ||
+ | *** liquid level monitor/probes | ||
+ | *** vacuum monitor/gauges | ||
+ | *** what else? | ||
+ | ** complete PLC programming | ||
+ | ** complete HMI programming | ||
+ | ** complete EWEB programming | ||
+ | ** install safety equipment, beacons, barriers, etc. | ||
− | * | + | * Rdesktop/VNC policy and procedures - Yi, Josh |
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | + | ||
− | * Controls racks - Scot | + | * Controls racks and interlocks - Scot, Mark S |
** strain gauge and UPS interlocks | ** strain gauge and UPS interlocks | ||
+ | ** UPS lifetime test | ||
+ | ** vacuum gauge timer? | ||
+ | ** vacuum gate valve interlock installation, test | ||
* PLC operations - Mark W | * PLC operations - Mark W | ||
− | ** PID tuning, calibration, JT valve limits, etc. | + | ** PID tuning, calibration, JT valve limits, other limits, etc. |
+ | ** rework PID loop strategy | ||
** magnet ramp down mechanism | ** magnet ramp down mechanism | ||
− | ** UPS interlock | + | ** UPS interlock status |
+ | ** alarm strategy | ||
+ | ** can PLC log info to file? | ||
+ | ** improve early problem detection | ||
** another tutorial | ** another tutorial | ||
Line 54: | Line 81: | ||
** connection to guard shack and notification conditions | ** connection to guard shack and notification conditions | ||
** [[pager_status_10_21_2010 | pager status ]] and strategy | ** [[pager_status_10_21_2010 | pager status ]] and strategy | ||
+ | |||
* HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes | * HMI and [http://halldeweb1.jlab.org/user/web/plc_urls.html EWEB programming] - Yi, Hovanes | ||
** program access to archived data | ** program access to archived data | ||
+ | ** alarm screens | ||
+ | ** long-term archive strategy | ||
** another tutorial | ** another tutorial | ||
+ | ** Remote access of screens using VNC [http://www.jlab.org/Hall-D/software/wiki/index.php/Access_HMI_screens_through_VNC] | ||
+ | |||
+ | * Labview/fast DAQ - Yi, Elliott | ||
+ | ** computer | ||
+ | ** hardware | ||
+ | ** programming | ||
+ | *** coordinate time, state with PLC | ||
+ | ** displays | ||
+ | ** archive | ||
+ | |||
+ | * Elog experience - All | ||
+ | ** remember to enter your name! | ||
+ | ** do we need automatic entries? | ||
+ | |||
* Coil repair status - George | * Coil repair status - George | ||
+ | ** loose CF (ConFlat) flanges | ||
+ | |||
* Learn how to use Linux for web and email - Elliott | * Learn how to use Linux for web and email - Elliott | ||
+ | |||
* Solenoid review 7-Dec | * Solenoid review 7-Dec | ||
− | * Purchase | + | |
+ | * Purchase another PLC and Ethernet module - Elliott | ||
+ | ** training | ||
+ | ** develop/test FDC cooling control system, drift chamber gas control system, etc. | ||
+ | ** need time and cost schedule first! | ||
+ | |||
* Hall D Technical web page | * Hall D Technical web page | ||
+ | |||
+ | * PI Responsibilities during test - Jonathan | ||
+ | ** Low power magnet testing 5A, 50A,100A - Elliott | ||
+ | ** High power magnet testing 100-1500A - Elliott | ||
+ | ** Identify possible turn to turn shorts during ramping - Eugene | ||
+ | ** Assess Heim column centering in coil - George | ||
+ | ** Assess Axial column forces - George | ||
+ | ** Estimate LN2 and He heat leak - Jonathan | ||
+ | ** Assess LN2 and LHe thermal siphons - Jonathan | ||
+ | |||
* Preparations for testing next coil - George, Scot, Elliott | * Preparations for testing next coil - George, Scot, Elliott | ||
** update P&I | ** update P&I |
Latest revision as of 13:00, 11 November 2010
Solenoid Coil Test Weekly Meeting
Location and Time
- Thu 4-Nov-2010 9:30 am ARC 428
Agenda
- Speeding up cooldown
- can we use top fill somehow?
- If not now, for the next coil?
- ODH on platform?
- Pager strategy - All
- who has been carrying the pager?
- are we ready to connect to the guard shack?
- Long term personnel outlook - Elliott
- tranfer of PLC programming responsibility
- getting help, esp. for double shifts for removal/installation
- losing help!
- Experience with control system - All
- what have we learned, is it written down?
- what will we do differently for the next coil?
- what needs to be added/modified/improved?
- EWEB strip charts
- add missing sensors to EWEB pages
- add PID info
- Preparation for powered operations - Elliott
- OSP, checklists, etc.
- shunt installation/wiring, connection to interlock/control system
- ground fault detection
- fast DAQ, which channels, what rates, how to coordinate time with PLC archive?
- rewire quench detector, how to balance channels?
- revisit fast/slow dump strategies - avoid fast dumps at all costs
- Hall probe
- pickup coils
- 230 V UPS on Danfysik control boards, main switch
- more redundancy?
- interlock checkout
- ODH rating on platform and training
- broken/flaky sensors/gauges/instruments
- replace Pt sensor in heat exchanger with Si diode?
- C-glass calibrations
- flat-lined Pt sensors
- vacuum gate valve interlock
- what to do about strain gauges?
- what spares should we order?
- liquid level monitor/probes
- vacuum monitor/gauges
- what else?
- complete PLC programming
- complete HMI programming
- complete EWEB programming
- install safety equipment, beacons, barriers, etc.
- Rdesktop/VNC policy and procedures - Yi, Josh
- Controls racks and interlocks - Scot, Mark S
- strain gauge and UPS interlocks
- UPS lifetime test
- vacuum gauge timer?
- vacuum gate valve interlock installation, test
- PLC operations - Mark W
- PID tuning, calibration, JT valve limits, other limits, etc.
- rework PID loop strategy
- magnet ramp down mechanism
- UPS interlock status
- alarm strategy
- can PLC log info to file?
- improve early problem detection
- another tutorial
- EPICS - Hovanes
- connection to guard shack and notification conditions
- pager status and strategy
- HMI and EWEB programming - Yi, Hovanes
- program access to archived data
- alarm screens
- long-term archive strategy
- another tutorial
- Remote access of screens using VNC [1]
- Labview/fast DAQ - Yi, Elliott
- computer
- hardware
- programming
- coordinate time, state with PLC
- displays
- archive
- Elog experience - All
- remember to enter your name!
- do we need automatic entries?
- Coil repair status - George
- loose CF (ConFlat) flanges
- Learn how to use Linux for web and email - Elliott
- Solenoid review 7-Dec
- Purchase another PLC and Ethernet module - Elliott
- training
- develop/test FDC cooling control system, drift chamber gas control system, etc.
- need time and cost schedule first!
- Hall D Technical web page
- PI Responsibilities during test - Jonathan
- Low power magnet testing 5A, 50A,100A - Elliott
- High power magnet testing 100-1500A - Elliott
- Identify possible turn to turn shorts during ramping - Eugene
- Assess Heim column centering in coil - George
- Assess Axial column forces - George
- Estimate LN2 and He heat leak - Jonathan
- Assess LN2 and LHe thermal siphons - Jonathan
- Preparations for testing next coil - George, Scot, Elliott
- update P&I
- splices
- yoke location
- piping adaptors
- downstream yoke spacers
- controls racks rewiring
- quench detector connections
- connectors on next coil
- fix known problems