Difference between revisions of "Coil Test Weekly Meeting 21-Jan-2010"

From GlueXWiki
Jump to: navigation, search
m
 
m
 
(3 intermediate revisions by the same user not shown)
Line 10: Line 10:
  
 
* Safety narrative and PLC programming strategy - Elliott
 
* Safety narrative and PLC programming strategy - Elliott
 +
** preparation for safety reviews
 
* P&I diagram including machine protection systems - George, Josh, Scot, Elliott
 
* P&I diagram including machine protection systems - George, Josh, Scot, Elliott
 
* Final narrative including cryo, power, safety, machine protection, fault diagnosis - George
 
* Final narrative including cryo, power, safety, machine protection, fault diagnosis - George
Line 17: Line 18:
 
* Status of items on George's punch list - George
 
* Status of items on George's punch list - George
 
* Yoke fillers - George
 
* Yoke fillers - George
 +
* GN2 vent piping system tie-in - Mark S
 +
* When do we start installing things in Test Lab - Tom
 +
** delivery dates of platform stand, cryo can, IUCF items, etc.
 +
* What PLC display pages do we want, and what should be archived and how often - George
 +
** main pages, fault pages, trends, etc.
 
* FastTrack schedule status - George, Chuck
 
* FastTrack schedule status - George, Chuck
 
* Coil 1 cryostat testing status - George
 
* Coil 1 cryostat testing status - George
Line 27: Line 33:
 
* Arrange for telecom in Test Lab - Elliott
 
* Arrange for telecom in Test Lab - Elliott
 
* Arrange for networking in Test Lab - Elliott
 
* Arrange for networking in Test Lab - Elliott
* GN2 vent piping system - Tom
 
 
* QWeak area, bigger door in F117 - Tom
 
* QWeak area, bigger door in F117 - Tom
 
* Locating computer in SRF control room - Elliott
 
* Locating computer in SRF control room - Elliott

Latest revision as of 16:34, 19 January 2010

Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 21-Jan-2010 9:45 am ARC 428


Agenda

  • Safety narrative and PLC programming strategy - Elliott
    • preparation for safety reviews
  • P&I diagram including machine protection systems - George, Josh, Scot, Elliott
  • Final narrative including cryo, power, safety, machine protection, fault diagnosis - George
  • Status of PLC programming - Mark W
  • Status of controls drawings and wiring lists - Scot
  • Wiring progress in F117 - Scot
  • Status of items on George's punch list - George
  • Yoke fillers - George
  • GN2 vent piping system tie-in - Mark S
  • When do we start installing things in Test Lab - Tom
    • delivery dates of platform stand, cryo can, IUCF items, etc.
  • What PLC display pages do we want, and what should be archived and how often - George
    • main pages, fault pages, trends, etc.
  • FastTrack schedule status - George, Chuck
  • Coil 1 cryostat testing status - George
  • Coil 1 status - George
  • Coil 2 cost and schedule - George
  • Coil 3 statement of work, visit and IUCF contract - George, Tom
  • Coil 4 controls wiring replacement - George
  • Shipping rails and transportainer from IUCF - Chuck
  • Arrange for electrical work in Test Lab - Tom
  • Arrange for telecom in Test Lab - Elliott
  • Arrange for networking in Test Lab - Elliott
  • QWeak area, bigger door in F117 - Tom
  • Locating computer in SRF control room - Elliott
  • Backup computer - Elliott
  • Safety reviews: when to start formal process - George, Elliott
  • 5 G contours - George
  • Coil Test Top To-Do items