Solenoid Coil Test Weekly Meeting

Location and Time

  • Thu 21-Jan-2010 9:45 am ARC 428


Agenda

  • Safety narrative and PLC programming strategy - Elliott
    • preparation for safety reviews
  • P&I diagram including machine protection systems - George, Josh, Scot, Elliott
  • Final narrative including cryo, power, safety, machine protection, fault diagnosis - George
  • Status of PLC programming - Mark W
  • Status of controls drawings and wiring lists - Scot
  • Wiring progress in F117 - Scot
  • Status of items on George's punch list - George
  • Yoke fillers - George
  • GN2 vent piping system tie-in - Mark S
  • When do we start installing things in Test Lab - Tom
    • delivery dates of platform stand, cryo can, IUCF items, etc.
  • What PLC display pages do we want, and what should be archived and how often - George
    • main pages, fault pages, trends, etc.
  • FastTrack schedule status - George, Chuck
  • Coil 1 cryostat testing status - George
  • Coil 1 status - George
  • Coil 2 cost and schedule - George
  • Coil 3 statement of work, visit and IUCF contract - George, Tom
  • Coil 4 controls wiring replacement - George
  • Shipping rails and transportainer from IUCF - Chuck
  • Arrange for electrical work in Test Lab - Tom
  • Arrange for telecom in Test Lab - Elliott
  • Arrange for networking in Test Lab - Elliott
  • QWeak area, bigger door in F117 - Tom
  • Locating computer in SRF control room - Elliott
  • Backup computer - Elliott
  • Safety reviews: when to start formal process - George, Elliott
  • 5 G contours - George
  • Coil Test Top To-Do items