Difference between revisions of "Coil Test Weekly Meeting 25-Nov-2009"

From GlueXWiki
Jump to: navigation, search
m
m
 
(One intermediate revision by the same user not shown)
Line 9: Line 9:
 
'''Agenda'''
 
'''Agenda'''
  
* QWeak area: when can we get in, how will we use it - Tom
 
 
* Solenoid review aftermath - George
 
* Solenoid review aftermath - George
 
* FastTrack schedules:  George/Chuck's version and Tom's version - George, Tom
 
* FastTrack schedules:  George/Chuck's version and Tom's version - George, Tom
 +
* QWeak area: when can we get in, how will we use it - Tom
 
* Design interface to cryo can - George
 
* Design interface to cryo can - George
 
* Pressure relief system design - George
 
* Pressure relief system design - George
Line 26: Line 26:
 
** Do we need an additional 19" rack? - Scot
 
** Do we need an additional 19" rack? - Scot
 
** Do we need additional rack doors, tops, etc? - Scot, Mark S or Tom
 
** Do we need additional rack doors, tops, etc? - Scot, Mark S or Tom
 +
** Dataforth module voltage requirements:  do they match? - Scot
 
* Can two 19" racks be removed from F117 as a unit? - Scot
 
* Can two 19" racks be removed from F117 as a unit? - Scot
 
* P&I, controls drawings, narrative - George, Mark S, Mark W
 
* P&I, controls drawings, narrative - George, Mark S, Mark W

Latest revision as of 14:55, 24 November 2009

Solenoid Coil Test Weekly Meeting

Location and Time

  • Wed 25-Nov-2009 9:45 am ARC 428


Agenda

  • Solenoid review aftermath - George
  • FastTrack schedules: George/Chuck's version and Tom's version - George, Tom
  • QWeak area: when can we get in, how will we use it - Tom
  • Design interface to cryo can - George
  • Pressure relief system design - George
  • Ordering cryo can - George
  • Ordering platform - George
  • Construction/installation sequence drawings - George, Chuck
  • Ordering remaining controls instrumentation and components - Scot, Elliott
    • 1-channel vs 2-channel A-B RS232 controllers - Elliott
    • Negative voltages, 0-20 mA outputs and A-B input modules: do they match? - Scot, Elliott
    • Do we need an additional A-B chassis? - Scot
    • Do we need additional Dataforth chassis? _ Scot
    • Do we have enough relay channels? - Scot
    • Isolated vs non-isolated voltage channels: do we have enough? - Scot
    • Do we need an additional 19" rack? - Scot
    • Do we need additional rack doors, tops, etc? - Scot, Mark S or Tom
    • Dataforth module voltage requirements: do they match? - Scot
  • Can two 19" racks be removed from F117 as a unit? - Scot
  • P&I, controls drawings, narrative - George, Mark S, Mark W
  • Instrumenting controls racks in F117 - Mark S, Scot
  • Should we get help from Chris' group - Elliott
  • PLC programming and testing - Mark W
  • Coil 1 testing and wire replacement - George
  • Coil 2 cost/schedule review, etc. - George
  • Coil 3 statement of work, visit and IUCF contract - George, Tom
  • Coil 4 controls wiring replacement - George
  • Shipping rails from IUCF - Tom
  • Safety reviews - George, Elliott
  • 5 G contours - George
  • Modifications to power supply dump resistor wiring - Mark S
  • Review "Top To-Do" items - Elliott
  • Review of recent progress, identify action items - All