Difference between revisions of "Collimator cave background"

From GlueXWiki
Jump to: navigation, search
 
Line 1: Line 1:
 +
* [http://www.jlab.org/~somov/cave_bg/note_cave_bg_v1.pdf] -  Simulation of Collimator Cave and Pair Spectrometer background
 +
 
Bellow are some plots with the dose distributions in the experimental hall and the
 
Bellow are some plots with the dose distributions in the experimental hall and the
 
collimator cave which Pavel Degtiarenko produced using his GEANT simulation.  
 
collimator cave which Pavel Degtiarenko produced using his GEANT simulation.  
 
His simulation is expected to provide more realistic production of neutrons in gamma(e) nucleus  
 
His simulation is expected to provide more realistic production of neutrons in gamma(e) nucleus  
interactions. These plots correspond to a "standard" (2007-12-07) collimator cave geometry  
+
interactions. These plots correspond to a "standard " (old 2007-12-07) collimator cave geometry  
 
which is implemented in the GEANT simulation (a new geometry version with updated layout of  
 
which is implemented in the GEANT simulation (a new geometry version with updated layout of  
 
sweeping magnets will come out soon).
 
sweeping magnets will come out soon).

Revision as of 09:50, 9 July 2008

  • [1] - Simulation of Collimator Cave and Pair Spectrometer background

Bellow are some plots with the dose distributions in the experimental hall and the collimator cave which Pavel Degtiarenko produced using his GEANT simulation. His simulation is expected to provide more realistic production of neutrons in gamma(e) nucleus interactions. These plots correspond to a "standard " (old 2007-12-07) collimator cave geometry which is implemented in the GEANT simulation (a new geometry version with updated layout of sweeping magnets will come out soon).

  • [2] - neutrons produced by 10000 beam photons
  • [3] - integrated dose distributions