Difference between revisions of "Controls Meeting 11-Aug-2011"

From GlueXWiki
Jump to: navigation, search
(Time/Location)
Line 3: Line 3:
 
* Announcements  
 
* Announcements  
 
* Indiana University HV system  
 
* Indiana University HV system  
:# Features of the existing software/hardware system  
+
:# Features of the existing software/hardware system.
:# Options for EPICS interface   
+
:# [[media:EPICS_IU_HV_proposal.pdf | A proposal for EPICS interface]].  
:# Which parameters needs to be controlled and monitored from EPICS  
+
:# Which parameters needs to be controlled and monitored from EPICS.
 
* AOT
 
* AOT
  

Revision as of 16:47, 10 August 2011

Agenda

  • Announcements
  • Indiana University HV system
  1. Features of the existing software/hardware system.
  2. A proposal for EPICS interface.
  3. Which parameters needs to be controlled and monitored from EPICS.
  • AOT


Time/Location

9:30 AM Thurs 11-Aug-2011 CC F326 (Call regular Hall D ESNET # 8542553)