Difference between revisions of "Controls Meeting 17-Oct-2019"

From GlueXWiki
Jump to: navigation, search
Line 6: Line 6:
 
* gluon cluster upgrades (Hovanes)
 
* gluon cluster upgrades (Hovanes)
 
* Voltage controls changes (Hovanes)
 
* Voltage controls changes (Hovanes)
*: [[media:cdc_nolv_interlock_problem.png | CDC airflow interlock indicator green while CDC LV is interlocked]]
+
*: Noticed a problem : [[media:cdc_nolv_interlock_problem.png | CDC airflow interlock indicator green while CDC LV is interlocked]]
 
* ComCal installation/survey
 
* ComCal installation/survey
 
* DIRC controls (Nick)
 
* DIRC controls (Nick)

Revision as of 11:10, 15 October 2019

Time/Location

10:00AM Thursday 17-Oct-2019 CC B101