Difference between revisions of "Controls Meeting 19-Sep-2019"
From GlueXWiki
(Created page with "* Announcements * Solenoid status (Tim,Beni,Brian) ** Cooldown ** PXI ** IOC reboot * Goniometer controls ** XPS Controllers (Nick, Hovanes) ** Survey results * gluon clust...") |
|||
Line 6: | Line 6: | ||
* Goniometer controls | * Goniometer controls | ||
** XPS Controllers (Nick, Hovanes) | ** XPS Controllers (Nick, Hovanes) | ||
− | ** | + | ** Lab survey results |
+ | ** Next survey | ||
* gluon cluster upgrades (Hovanes) | * gluon cluster upgrades (Hovanes) | ||
* Test setup for power crates | * Test setup for power crates |
Revision as of 11:37, 18 September 2019
- Announcements
- Solenoid status (Tim,Beni,Brian)
- Cooldown
- PXI
- IOC reboot
- Goniometer controls
- XPS Controllers (Nick, Hovanes)
- Lab survey results
- Next survey
- gluon cluster upgrades (Hovanes)
- Test setup for power crates
- Tagger NMR (Nick)
- Target WEDM GUIs (Hovanes, Tyler)
- DIRC installations (Nick)
- Other business
Time/Location
10:00AM Thursday 19-Sep-2019 CC B101