Difference between revisions of "Controls Meeting 21-Mar-2019"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
 
** Magnet warmup
 
** Magnet warmup
 
* COMCAL issues (all)
 
* COMCAL issues (all)
 +
** Motorized stage upgrade?
 
* Remote resets (Hovanes)
 
* Remote resets (Hovanes)
 
** Three VME crates used by OPS for our controls
 
** Three VME crates used by OPS for our controls

Revision as of 17:50, 20 March 2019

  • Announcements
  • Solenoid status (Tim,Beni)
    • Magnet warmup
  • COMCAL issues (all)
    • Motorized stage upgrade?
  • Remote resets (Hovanes)
    • Three VME crates used by OPS for our controls
    • CAEN HV crates (halldcaenhv10 aka d2-8-mid)
    • PDU called u1-10-pdu for the Wiener MPOD u1-10-top crate
  • DIRC plans
  • Other business

Time/Location

10:00AM Thursday 21-Mar-2019 CC B101