Difference between revisions of "Controls Meeting 22-Sep-2011"

From GlueXWiki
Jump to: navigation, search
m
m
Line 3: Line 3:
 
* Announcements
 
* Announcements
 
** GlueX collaboration meeting 6-8 Oct
 
** GlueX collaboration meeting 6-8 Oct
 +
** Target and solenoid control systems needed by Summer 2012
 +
** /group/halldonline
 +
** Vardan will talk on "farm manager" at 28-Sep Online meeting
 
* Minutes from previous meeting [[Controls_Meeting_8-Sep-2011|8-Sep-2011]]
 
* Minutes from previous meeting [[Controls_Meeting_8-Sep-2011|8-Sep-2011]]
* Equipment orders - Mark, Hovanes
+
* Equipment order status - Mark, Hovanes
** test equipment
+
* Quench detector status - Elliott
** rack hardware, Ethernet power strips
+
 
* Test Lab status
 
* Test Lab status
 +
** Danfysik power supply
 +
* Setting up in EEL 126 - Hovanes
 
* Upgrade to solenoid control system - All
 
* Upgrade to solenoid control system - All
** needed about one year from now
+
* A-B license server - Josh
** new hardware design based on experience in Test Lab
+
* UPS power in the hall - Elliott
** need to collect requirements for hardware and software
+
* Networking in the hall, counting house, trailer, tagger bldg - Elliott
** do we want to upgrade to Ethernet/IP control on Danfysik power supply (from RS232)?
+
** need subgroup to work on this
+
* A-B licenses and license server - Josh
+
** add licenses from other groups?  dedicated licenses?  priorities?
+
* Interim networking in the hall - Elliott
+
* ControlNet vs Ethernet/IP - Hovanes
+
 
* Controls test stand, BOY, etc. - Hovanes
 
* Controls test stand, BOY, etc. - Hovanes
 +
* Role of Labview? - All
 
* Nerses Gevorgyan coming - Hovanes
 
* Nerses Gevorgyan coming - Hovanes
* Solenoid and Target controls needed by next summer
+
* PyIRMIS - Elliott, Hovanes
* [http://irmisvm.jlab.org:8080/IRMISComponents PyIRMIS] - Elliott, Hovanes
+
 
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
 
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
  

Revision as of 13:15, 21 September 2011

Agenda

  • Announcements
    • GlueX collaboration meeting 6-8 Oct
    • Target and solenoid control systems needed by Summer 2012
    • /group/halldonline
    • Vardan will talk on "farm manager" at 28-Sep Online meeting
  • Minutes from previous meeting 8-Sep-2011
  • Equipment order status - Mark, Hovanes
  • Quench detector status - Elliott
  • Test Lab status
    • Danfysik power supply
  • Setting up in EEL 126 - Hovanes
  • Upgrade to solenoid control system - All
  • A-B license server - Josh
  • UPS power in the hall - Elliott
  • Networking in the hall, counting house, trailer, tagger bldg - Elliott
  • Controls test stand, BOY, etc. - Hovanes
  • Role of Labview? - All
  • Nerses Gevorgyan coming - Hovanes
  • PyIRMIS - Elliott, Hovanes
  • Mantis task tracker


Time/Location

Note different room this week

9:30 AM Thurs 8-Sep-2011 CC L102/104


Announcements

Next Meeting

Note we skip a meeting due to the GlueX collaboration meeting

Thurs 20-Oct 9:30am CC L207


Minutes