Line 3: Line 3:
 
* Announcements
 
* Announcements
 
** GlueX collaboration meeting 6-8 Oct
 
** GlueX collaboration meeting 6-8 Oct
* Minutes from previous meeting [[Controls_Meeting_15-Sep-2011|15-Sep-2011]]
+
** Target and solenoid control systems needed by Summer 2012
* Equipment orders - Mark, Hovanes
+
** /group/halldonline
** test equipment
+
** Vardan will talk on "farm manager" at 28-Sep Online meeting
** rack hardware, Ethernet power strips
+
* Minutes from previous meeting [[Controls_Meeting_8-Sep-2011|8-Sep-2011]]
 +
* Equipment order status - Mark, Hovanes
 +
* [http://www.rtaautomation.com/products/435/nbx.html 435NBX] and Structured Text - Elliott
 +
* Quench detector status - Elliott
 
* Test Lab status
 
* Test Lab status
 +
** Danfysik power supply
 +
* Setting up in EEL 126 - Hovanes
 
* Upgrade to solenoid control system - All
 
* Upgrade to solenoid control system - All
** needed about one year from now
+
* A-B license server - Josh
** new hardware design based on experience in Test Lab
+
* UPS power in the hall - Elliott
** need to collect requirements for hardware and software
+
* Networking in the hall, counting house, trailer, tagger bldg - Elliott
** do we want to upgrade to Ethernet/IP control on Danfysik power supply (from RS232)?
+
** need subgroup to work on this
+
* A-B licenses and license server - Josh
+
** add licenses from other groups?  dedicated licenses?  priorities?
+
* Interim networking in the hall - Elliott
+
* ControlNet vs Ethernet/IP - Hovanes
+
 
* Controls test stand, BOY, etc. - Hovanes
 
* Controls test stand, BOY, etc. - Hovanes
 +
* Role of Labview? - All
 
* Nerses Gevorgyan coming - Hovanes
 
* Nerses Gevorgyan coming - Hovanes
* Solenoid and Target controls needed by next summer
+
* PyIRMIS - Elliott, Hovanes
* [http://irmisvm.jlab.org:8080/IRMISComponents PyIRMIS] - Elliott, Hovanes
+
* [http://halldweb.jlab.org/mantisbt Mantis task tracker]
* [http://halldweb1.jlab.org/mantisbt Mantis task tracker]
+
  
  
Line 31: Line 30:
 
'''Note different room this week'''
 
'''Note different room this week'''
  
9:30 AM Thurs 8-Sep-2011 CC L102/104
+
9:30 AM Thurs 22-Sep-2011 CC L102/104
  
  
Line 49: Line 48:
  
 
=Minutes=
 
=Minutes=
 +
 +
 +
'''Equipment Orders - near-term'''
 +
 +
Mark began ordering test equipment, rack parts and other items on FY11 and FY12 budgets.  The FY12 budget froze and some of the items will be ordered after 1-Oct or when they unfreeze the budget.  Hovanes is in the process of collecting requirements for computer equipment for FY12.
 +
 +
 +
 +
'''Handling RS232'''
 +
 +
Elliott described a number of ways to connect the PLC to RS232 devices.  Currently we use A-B Point I/O serial modules.  Real Time Automation makes the 435NBX, an Ethernet module that has a serial port and can be directly accessed by the PLC with minimal programming.  Cost is slightly more than the Point I/O modules, but there are many advantages, and there may be a limit on the number of serial modules allowed on a Point I/O bus.  It costs around $500 for a bare Point I/O system.
 +
 +
Elliott suggests we purchase one 435NBX for testing.
 +
 +
 +
 +
'''Quench Detector'''
 +
 +
The Danfysik quench detector works reasonably well if there is a good inductance match between the coils being compared.  Floyd needs to simulate the final solenoid configuration so we can see if we can get a good balance and cover all sub-coils.  If not we will have to build a new QD.  We may want to do this anyway.
 +
 +
 +
 +
'''Test Lab'''
 +
 +
We are moving out of the Test Lab.  The solenoid is being moved to the hall and the controls racks to the new Physics building.  We will move the computers to EEL 126 or to offices as needed.  It is not clear where the Danfysik power supply will go.
 +
 +
 +
 +
'''EEL 126'''
 +
 +
Hovanes continues to set up controls equipment in EEL 126.  Some EPICS development has beed done for the HV and LV power supplies.
 +
 +
 +
 +
'''Solenoid Controls'''
 +
 +
Subcommittee just getting going on redesign.
 +
 +
 +
 +
'''UPS power in the hall'''
 +
 +
About all we could come up with was to power the solenoid controls racks, maybe the target control system, and some networking switches.  Mark's criterion for UPS power is the recovery time if power is lost.  If it takes a long time to recover, longer than an hour or so, the system should be on the UPS. 
 +
 +
 +
 +
'''PyIRMIS'''
 +
 +
The original IRMIS project has been canceled in favor of PyIRMIS.  This uses a Python-based interface to basically the same underlying database schema.  Release is expected some time this Fall.  This is being developed by Don Dohan at BNL, and supposedly will be used for the new light source there.

Latest revision as of 11:03, 31 March 2015

Agenda

  • Announcements
    • GlueX collaboration meeting 6-8 Oct
    • Target and solenoid control systems needed by Summer 2012
    • /group/halldonline
    • Vardan will talk on "farm manager" at 28-Sep Online meeting
  • Minutes from previous meeting 8-Sep-2011
  • Equipment order status - Mark, Hovanes
  • 435NBX and Structured Text - Elliott
  • Quench detector status - Elliott
  • Test Lab status
    • Danfysik power supply
  • Setting up in EEL 126 - Hovanes
  • Upgrade to solenoid control system - All
  • A-B license server - Josh
  • UPS power in the hall - Elliott
  • Networking in the hall, counting house, trailer, tagger bldg - Elliott
  • Controls test stand, BOY, etc. - Hovanes
  • Role of Labview? - All
  • Nerses Gevorgyan coming - Hovanes
  • PyIRMIS - Elliott, Hovanes
  • Mantis task tracker


Time/Location

Note different room this week

9:30 AM Thurs 22-Sep-2011 CC L102/104


Announcements

Next Meeting

Note we skip a meeting due to the GlueX collaboration meeting

Thurs 20-Oct 9:30am CC L207


Minutes

Equipment Orders - near-term

Mark began ordering test equipment, rack parts and other items on FY11 and FY12 budgets. The FY12 budget froze and some of the items will be ordered after 1-Oct or when they unfreeze the budget. Hovanes is in the process of collecting requirements for computer equipment for FY12.


Handling RS232

Elliott described a number of ways to connect the PLC to RS232 devices. Currently we use A-B Point I/O serial modules. Real Time Automation makes the 435NBX, an Ethernet module that has a serial port and can be directly accessed by the PLC with minimal programming. Cost is slightly more than the Point I/O modules, but there are many advantages, and there may be a limit on the number of serial modules allowed on a Point I/O bus. It costs around $500 for a bare Point I/O system.

Elliott suggests we purchase one 435NBX for testing.


Quench Detector

The Danfysik quench detector works reasonably well if there is a good inductance match between the coils being compared. Floyd needs to simulate the final solenoid configuration so we can see if we can get a good balance and cover all sub-coils. If not we will have to build a new QD. We may want to do this anyway.


Test Lab

We are moving out of the Test Lab. The solenoid is being moved to the hall and the controls racks to the new Physics building. We will move the computers to EEL 126 or to offices as needed. It is not clear where the Danfysik power supply will go.


EEL 126

Hovanes continues to set up controls equipment in EEL 126. Some EPICS development has beed done for the HV and LV power supplies.


Solenoid Controls

Subcommittee just getting going on redesign.


UPS power in the hall

About all we could come up with was to power the solenoid controls racks, maybe the target control system, and some networking switches. Mark's criterion for UPS power is the recovery time if power is lost. If it takes a long time to recover, longer than an hour or so, the system should be on the UPS.


PyIRMIS

The original IRMIS project has been canceled in favor of PyIRMIS. This uses a Python-based interface to basically the same underlying database schema. Release is expected some time this Fall. This is being developed by Don Dohan at BNL, and supposedly will be used for the new light source there.