Difference between revisions of "Controls Meeting 23-Feb-2023"

From GlueXWiki
Jump to: navigation, search
 
(3 intermediate revisions by 2 users not shown)
Line 2: Line 2:
 
* Solenoid status  
 
* Solenoid status  
 
** PXI spare procurement (Brian)
 
** PXI spare procurement (Brian)
 +
** Cryo-monitor, Supply N2 pressure, and N2 pressure removed from the interlock screen (Hovanes)
  
 
* [https://logbooks.jlab.org/entry/4136666 BCAL chiller swap] (Hovanes)
 
* [https://logbooks.jlab.org/entry/4136666 BCAL chiller swap] (Hovanes)
Line 7: Line 8:
 
* Atmospheric pressure sensor (Bobby, Scot)
 
* Atmospheric pressure sensor (Bobby, Scot)
 
* Tagger magnet NMR box (Tim)
 
* Tagger magnet NMR box (Tim)
 +
*: [https://logbooks.jlab.org/entry/4131747 Remote resets are available through browser]
 +
* [[Media:FCAL2_controls.pdf | FCAL2 Controls ]] (Tim)
 
* Other items
 
* Other items
  

Latest revision as of 17:24, 22 February 2023

  • Announcements
  • Solenoid status
    • PXI spare procurement (Brian)
    • Cryo-monitor, Supply N2 pressure, and N2 pressure removed from the interlock screen (Hovanes)


Time/Location

10:00am Thursday 23-February-2023