Difference between revisions of "Controls Meeting 25-Apr-2024"

From GlueXWiki
Jump to: navigation, search
(Created page with "* Announcements * Solenoid status ** PXI code modifications (Brian,Hovanes,Beni) * PLC developments (Bobby, Josh) *# ECAL chiller *::* Modbus interface *::* Flow monitorin...")
 
 
(3 intermediate revisions by the same user not shown)
Line 5: Line 5:
 
* PLC developments (Bobby, Josh)
 
* PLC developments (Bobby, Josh)
 
*# ECAL  chiller  
 
*# ECAL  chiller  
*::* Modbus interface
+
*#:* Modbus interface
*::* Flow monitoring
+
*#:* Flow monitoring
*# Dark room environemt sensors  
+
*# Dark room environment sensors  
*# Fan control and status monitoring
+
*# Fan control and fan status monitoring
*# ECAL HV crate resets and board interlocks
+
*# ECAL HV crate resets and HV board interlocks
 
*# EPICS screens
 
*# EPICS screens
 
* Status of the power for the ECAL racks (Tim, Scot)
 
* Status of the power for the ECAL racks (Tim, Scot)
 
* ECAL and FCAL voltage controls (Hovanes)
 
* ECAL and FCAL voltage controls (Hovanes)
 
* New NMR probe and chassis tests (Tim)
 
* New NMR probe and chassis tests (Tim)
 +
* PLC-related software licenses (Bobby, Josh)
 
* Other items
 
* Other items
  
Line 19: Line 20:
 
==Time/Location==
 
==Time/Location==
  
10:00am Thursday 25-January-2023
+
10:00am Thursday 25-April-2024

Latest revision as of 10:25, 25 April 2024

  • Announcements
  • Solenoid status
    • PXI code modifications (Brian,Hovanes,Beni)
  • PLC developments (Bobby, Josh)
    1. ECAL chiller
      • Modbus interface
      • Flow monitoring
    2. Dark room environment sensors
    3. Fan control and fan status monitoring
    4. ECAL HV crate resets and HV board interlocks
    5. EPICS screens
  • Status of the power for the ECAL racks (Tim, Scot)
  • ECAL and FCAL voltage controls (Hovanes)
  • New NMR probe and chassis tests (Tim)
  • PLC-related software licenses (Bobby, Josh)
  • Other items


Time/Location

10:00am Thursday 25-April-2024