Difference between revisions of "Controls Meeting 25-Apr-2024"
From GlueXWiki
(Created page with "* Announcements * Solenoid status ** PXI code modifications (Brian,Hovanes,Beni) * PLC developments (Bobby, Josh) *# ECAL chiller *::* Modbus interface *::* Flow monitorin...") |
|||
Line 7: | Line 7: | ||
*::* Modbus interface | *::* Modbus interface | ||
*::* Flow monitoring | *::* Flow monitoring | ||
− | *# Dark room | + | *# Dark room environment sensors |
− | *# Fan control and status monitoring | + | *# Fan control and fan status monitoring |
− | *# ECAL HV crate resets and board interlocks | + | *# ECAL HV crate resets and HV board interlocks |
*# EPICS screens | *# EPICS screens | ||
* Status of the power for the ECAL racks (Tim, Scot) | * Status of the power for the ECAL racks (Tim, Scot) | ||
* ECAL and FCAL voltage controls (Hovanes) | * ECAL and FCAL voltage controls (Hovanes) | ||
* New NMR probe and chassis tests (Tim) | * New NMR probe and chassis tests (Tim) | ||
+ | * PLC-related software licenses (Bobby, Josh) | ||
* Other items | * Other items | ||
Revision as of 09:43, 23 April 2024
- Announcements
- Solenoid status
- PXI code modifications (Brian,Hovanes,Beni)
- PLC developments (Bobby, Josh)
- ECAL chiller
- Modbus interface
- Flow monitoring
- Dark room environment sensors
- Fan control and fan status monitoring
- ECAL HV crate resets and HV board interlocks
- EPICS screens
- Status of the power for the ECAL racks (Tim, Scot)
- ECAL and FCAL voltage controls (Hovanes)
- New NMR probe and chassis tests (Tim)
- PLC-related software licenses (Bobby, Josh)
- Other items
Time/Location
10:00am Thursday 25-January-2023