(Created page with "* Announcements * Solenoid status ** PXI code modifications (Brian,Hovanes,Beni) * ECAL chiller status (Scot, Bobby) * ECAL and FCAL sensor installations (Bobby) * Status o...")
 
Line 7: Line 7:
 
* Status of the power for the ECAL racks (Tim, Scot)
 
* Status of the power for the ECAL racks (Tim, Scot)
 
* ECAL and FCAL voltage controls (Hovanes)
 
* ECAL and FCAL voltage controls (Hovanes)
* ECAL HV resets and interlocks (Bobby)
+
* ECAL HV crate resets and board interlocks (Bobby)
 
* New NMR probe and chassis (Scot,Hovanes)
 
* New NMR probe and chassis (Scot,Hovanes)
 
* Other items
 
* Other items

Revision as of 12:14, 24 January 2024

  • Announcements
  • Solenoid status
    • PXI code modifications (Brian,Hovanes,Beni)
  • ECAL chiller status (Scot, Bobby)
  • ECAL and FCAL sensor installations (Bobby)
  • Status of the power for the ECAL racks (Tim, Scot)
  • ECAL and FCAL voltage controls (Hovanes)
  • ECAL HV crate resets and board interlocks (Bobby)
  • New NMR probe and chassis (Scot,Hovanes)
  • Other items


Time/Location

10:00am Thursday 25-January-2023