Line 7: | Line 7: | ||
* FCAL HV controls modifications (Hovanes,Nick) | * FCAL HV controls modifications (Hovanes,Nick) | ||
* FCAL2 chillers (Nick) | * FCAL2 chillers (Nick) | ||
− | * Vacuum gatevalve problems (Nick) | + | * Vacuum gatevalve problems and PLC-s (Nick) |
* DIRC N2 Issues- North | * DIRC N2 Issues- North | ||
*: New DIRC N2 controls | *: New DIRC N2 controls |
Revision as of 15:17, 24 March 2021
Announcements
- Solenoid status
- State code in PLC (Nick)
- PXI issues (Brian)
- GUIs for BCAL chiller controls(Hovanes)
- Magnet power supply related temperature readouts
- FCAL HV controls modifications (Hovanes,Nick)
- FCAL2 chillers (Nick)
- Vacuum gatevalve problems and PLC-s (Nick)
- DIRC N2 Issues- North
- New DIRC N2 controls
- Other items
- power on FCAL platform
- network switch in the tagger hall
- disconnected racks in the tagger hall