Difference between revisions of "Controls Meeting 26-Jan-2023"

From GlueXWiki
Jump to: navigation, search
(Created page with "* Announcements * Solenoid status ** PXI spare procurements (Brian) * FCAL-II tasks and assignments ** Dark room instrumentation **: Do we have the channel count and equipme...")
 
Line 2: Line 2:
 
* Solenoid status  
 
* Solenoid status  
 
** PXI spare procurements (Brian)
 
** PXI spare procurements (Brian)
 +
  
 
* FCAL-II tasks and assignments
 
* FCAL-II tasks and assignments
Line 13: Line 14:
 
** New FCAL-II interlocks?  
 
** New FCAL-II interlocks?  
 
** EPICS screens
 
** EPICS screens
 +
  
 
* BCAL chiller swap (Brian)
 
* BCAL chiller swap (Brian)

Revision as of 11:06, 24 January 2023

  • Announcements
  • Solenoid status
    • PXI spare procurements (Brian)


  • FCAL-II tasks and assignments
    • Dark room instrumentation
      Do we have the channel count and equipment for it?
    • Chillers
      PLC-to-chillers or EPICS-to-chillers
    • Voltages (LV and HV)
    • Interlocks
      FCAL-I interlocks stay the same?
    • New FCAL-II interlocks?
    • EPICS screens


  • BCAL chiller swap (Brian)
  • CAEN HV crate reset
  • Tagger magnet NMR box (Tim)
  • Other items

Time/Location