Difference between revisions of "Controls Meeting 26-Jan-2023"

From GlueXWiki
Jump to: navigation, search
 
Line 19: Line 19:
 
* BCAL chiller swap (Brian)
 
* BCAL chiller swap (Brian)
 
* CAEN HV crate reset  
 
* CAEN HV crate reset  
 +
* Atmospheric pressure sensor
 
* Tagger magnet NMR box (Tim)
 
* Tagger magnet NMR box (Tim)
 
* Other items
 
* Other items

Latest revision as of 11:44, 24 January 2023

  • Announcements
  • Solenoid status
    • PXI spare procurements (Brian)
  • Nick's laptop


  • FCAL-II tasks and assignments
    • Dark room instrumentation
      Do we have the channel count and equipment for it?
    • Chillers
      PLC-to-chillers or EPICS-to-chillers
    • Voltages (LV and HV)
    • Interlocks
      FCAL-I interlocks stay the same?
    • New FCAL-II interlocks?
    • EPICS screens


  • BCAL chiller swap (Brian)
  • CAEN HV crate reset
  • Atmospheric pressure sensor
  • Tagger magnet NMR box (Tim)
  • Other items

Time/Location

10:00am Thursday 26-January-2023