Controls Meeting 28-Apr-2022
From GlueXWiki
- Announcements
- Solenoid status
- New vacuum pump signal and the flow signals for cold leads
- Time syncing
- Schedule for power up
- FDC chiller regulation and interlocks (Hovanes, Tim)
- FMWPC voltages issues (Hovanes)
- New camera for CPP gas system ( south-cam.jlab.org )
- Motorized stage for the beam profiler replacement (Hovanes)
- New vertical stage for the test setup (Tim)
- Tagger magnet NMR box (Tim)
- UPS in the tagger hall (Tim, Hovanes)
- Other items
Time/Location
10:00am Thursday 28-Apr-2022