Difference between revisions of "Controls Meeting 28-Sep-2023"

From GlueXWiki
Jump to: navigation, search
 
(7 intermediate revisions by the same user not shown)
Line 1: Line 1:
 
* Announcements
 
* Announcements
 
* Solenoid status  
 
* Solenoid status  
 +
** PXI ADC calibrations (Tyler)
 
** PXI spare controller procurement (Brian)
 
** PXI spare controller procurement (Brian)
* Atmospheric pressure sensors (Bobby)
+
* Atmospheric pressure sensors (Bobby, Naomi)
* FCAL-2 chiller controls (Scot, Bobby)
+
 
 +
* FCAL-2 chiller status (Scot, Bobby)
 
* FCAL-2 sensors (Bobby)  
 
* FCAL-2 sensors (Bobby)  
 
* FCAL-2 voltage controls (Hovanes)
 
* FCAL-2 voltage controls (Hovanes)
* CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby)
 
 
* Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
 
* Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
 +
* Beamline vacuum alarms (Scot, Hovanes)
 
* New NMR probe (Scot)
 
* New NMR probe (Scot)
* Switch in the tagger hall (Hovanes)
+
* "halld-t1-7-sw" in the tagger hall (Hovanes)
 
* Other items
 
* Other items
  

Latest revision as of 16:03, 27 September 2023

  • Announcements
  • Solenoid status
    • PXI ADC calibrations (Tyler)
    • PXI spare controller procurement (Brian)
  • Atmospheric pressure sensors (Bobby, Naomi)
  • FCAL-2 chiller status (Scot, Bobby)
  • FCAL-2 sensors (Bobby)
  • FCAL-2 voltage controls (Hovanes)
  • Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
  • Beamline vacuum alarms (Scot, Hovanes)
  • New NMR probe (Scot)
  • "halld-t1-7-sw" in the tagger hall (Hovanes)
  • Other items


Time/Location

10:00am Thursday 28-September-2023