Difference between revisions of "Controls Meeting 28-Sep-2023"

From GlueXWiki
Jump to: navigation, search
Line 3: Line 3:
 
** PXI spare controller procurement (Brian)
 
** PXI spare controller procurement (Brian)
 
* Atmospheric pressure sensors (Bobby)
 
* Atmospheric pressure sensors (Bobby)
* FCAL-2 chiller controls (Scot, Bobby)
+
* FCAL-2 chiller status (Scot, Bobby)
 
* FCAL-2 sensors (Bobby)  
 
* FCAL-2 sensors (Bobby)  
 
* FCAL-2 voltage controls (Hovanes)
 
* FCAL-2 voltage controls (Hovanes)
* CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby)
 
 
* Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
 
* Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
 
* New NMR probe (Scot)
 
* New NMR probe (Scot)
 +
* CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby)
 
* Switch in the tagger hall (Hovanes)
 
* Switch in the tagger hall (Hovanes)
 
* Other items
 
* Other items

Revision as of 14:45, 26 September 2023

  • Announcements
  • Solenoid status
    • PXI spare controller procurement (Brian)
  • Atmospheric pressure sensors (Bobby)
  • FCAL-2 chiller status (Scot, Bobby)
  • FCAL-2 sensors (Bobby)
  • FCAL-2 voltage controls (Hovanes)
  • Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
  • New NMR probe (Scot)
  • CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby)
  • Switch in the tagger hall (Hovanes)
  • Other items


Time/Location

10:00am Thursday 28-September-2023