Difference between revisions of "Controls Meeting 28-Sep-2023"

From GlueXWiki
Jump to: navigation, search
Line 2: Line 2:
 
* Solenoid status  
 
* Solenoid status  
 
** PXI spare controller procurement (Brian, Naomi)
 
** PXI spare controller procurement (Brian, Naomi)
* Atmospheric pressure sensors (Bobby)
+
* Atmospheric pressure sensors (Bobby, Naomi)
 
* FCAL-2 chiller status (Scot, Bobby)
 
* FCAL-2 chiller status (Scot, Bobby)
 
* FCAL-2 sensors (Bobby)  
 
* FCAL-2 sensors (Bobby)  

Revision as of 09:59, 27 September 2023

  • Announcements
  • Solenoid status
    • PXI spare controller procurement (Brian, Naomi)
  • Atmospheric pressure sensors (Bobby, Naomi)
  • FCAL-2 chiller status (Scot, Bobby)
  • FCAL-2 sensors (Bobby)
  • FCAL-2 voltage controls (Hovanes)
  • Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
  • New NMR probe (Scot)
  • CAEN HV crate reset for T1-8-TOP and D2-8-TOP (Hovanes, Bobby)
  • "halld-t1-7-sw" in the tagger hall (Hovanes)
  • Other items


Time/Location

10:00am Thursday 28-September-2023