Difference between revisions of "Controls Meeting 28-Sep-2023"

From GlueXWiki
Jump to: navigation, search
 
Line 9: Line 9:
 
* FCAL-2 voltage controls (Hovanes)
 
* FCAL-2 voltage controls (Hovanes)
 
* Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
 
* Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
 +
* Beamline vacuum alarms (Scot, Hovanes)
 
* New NMR probe (Scot)
 
* New NMR probe (Scot)
 
* "halld-t1-7-sw" in the tagger hall (Hovanes)
 
* "halld-t1-7-sw" in the tagger hall (Hovanes)

Latest revision as of 16:03, 27 September 2023

  • Announcements
  • Solenoid status
    • PXI ADC calibrations (Tyler)
    • PXI spare controller procurement (Brian)
  • Atmospheric pressure sensors (Bobby, Naomi)
  • FCAL-2 chiller status (Scot, Bobby)
  • FCAL-2 sensors (Bobby)
  • FCAL-2 voltage controls (Hovanes)
  • Alarms for "GAS:i::FDC_CDC_Pressure-PT500" PV (Scot, Bobby)
  • Beamline vacuum alarms (Scot, Hovanes)
  • New NMR probe (Scot)
  • "halld-t1-7-sw" in the tagger hall (Hovanes)
  • Other items


Time/Location

10:00am Thursday 28-September-2023