Difference between revisions of "DC and PID Review"

From GlueXWiki
Jump to: navigation, search
Line 20: Line 20:
 
# First round of dry runs (week of March 10) TENTATIVE
 
# First round of dry runs (week of March 10) TENTATIVE
 
## Monday F326/327 Mar 10
 
## Monday F326/327 Mar 10
##* Talk 1 2:30pm Curtis
+
##* Talk 15 2:30pm Fernando
 
## Tuesday F326/327 Mar 11
 
## Tuesday F326/327 Mar 11
##*  Talk 2 4:00 pm Yves
+
##*  Talk 8 4:00 pm Tim
 
## Wednesday F326/327 Mar 12
 
## Wednesday F326/327 Mar 12
 
##* Talk 3 8:00 am Dan
 
##* Talk 3 8:00 am Dan
 
##* Talk 4 4:00 pm David
 
##* Talk 4 4:00 pm David
 
## Thursday F326/327 Mar 13
 
## Thursday F326/327 Mar 13
##* Talk 5 4:30 pm Fernando
+
##* Talk 2 4:30 pm Yves
 
##* Talk 6  4:30 pm Elton
 
##* Talk 6  4:30 pm Elton
 
## Friday L207 Mar 14
 
## Friday L207 Mar 14
 
##*  Talk 7 8:00 am Eugene
 
##*  Talk 7 8:00 am Eugene
##*  Talk 8 10:00 am Tim
+
##*  Talk 1 10:00 am Curtis
 
# Second round of dry runs (week of Mar 17) TENTATIVE
 
# Second round of dry runs (week of Mar 17) TENTATIVE
 
# Final talks to Elke:Tue Mar 25
 
# Final talks to Elke:Tue Mar 25
 
# Review: Mar 27 and 28
 
# Review: Mar 27 and 28
 
# issues that need special attention
 
# issues that need special attention

Revision as of 10:04, 25 February 2008

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

  1. Previous Reviews
  2. Mar 27-28 Review Documents (halld guest)
  3. Pre-brief Material. Due Mar 19 to reviewers.
    • Documents
      • Introduction Physics Motivation (Curtis)
      • Impact of PID on Physics (web page) (Eugene)
      • Simulation and Reconstruction {David)
      • Description CDC (Curtis)
      • Description FDC (Simon and Dan)
      • Description Forward Time-of-Flight (Alex/Beni/Matt?)
      • Electronics (F1TDC, ASIC, 100 MHz Flash) (Fernando)
    • Safety/QA documentation ESH&Q ?
    • Drawings (Tim)
    • Other?
  4. First round of dry runs (week of March 10) TENTATIVE
    1. Monday F326/327 Mar 10
      • Talk 15 2:30pm Fernando
    2. Tuesday F326/327 Mar 11
      • Talk 8 4:00 pm Tim
    3. Wednesday F326/327 Mar 12
      • Talk 3 8:00 am Dan
      • Talk 4 4:00 pm David
    4. Thursday F326/327 Mar 13
      • Talk 2 4:30 pm Yves
      • Talk 6 4:30 pm Elton
    5. Friday L207 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  5. Second round of dry runs (week of Mar 17) TENTATIVE
  6. Final talks to Elke:Tue Mar 25
  7. Review: Mar 27 and 28
  8. issues that need special attention