Difference between revisions of "DC and PID Review"

From GlueXWiki
Jump to: navigation, search
(Linked simulation document to SVN web interface)
Line 13: Line 13:
 
#** Description [[CDC]] (Curtis)
 
#** Description [[CDC]] (Curtis)
 
#** Description [[FDC]] (Simon and Dan)
 
#** Description [[FDC]] (Simon and Dan)
#** Description [[Forward Time-of-Flight]] (Beni/Matt)
+
#** Description [[Forward Time-of-Flight]] (Beni/Matt) [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=994 | document for CDR]
 
#** Description [[Start Counter]] (Werner)
 
#** Description [[Start Counter]] (Werner)
 
#** Electronics (F1TDC, ASIC, 100 MHz Flash) (Fernando)
 
#** Electronics (F1TDC, ASIC, 100 MHz Flash) (Fernando)

Revision as of 14:32, 3 March 2008

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

  1. Previous Reviews
  2. Mar 27-28 Review Documents (halld guest)
  3. Pre-brief Material. Due Mar 19 to reviewers.
  4. First round of dry runs (week of March 10) TENTATIVE
    1. Monday F326/327 Mar 10
      • Talk 15 2:30pm Fernando
    2. Tuesday F326/327 Mar 11
      • Talk 8 4:00 pm Tim
    3. Wednesday F326/327 Mar 12
      • Talk 3 8:00 am Dan
      • Talk 4 4:00 pm David
    4. Thursday F326/327 Mar 13
      • Talk 2 4:30 pm Yves
      • Talk 6 4:30 pm Elton
    5. Friday L207 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  5. Second round of dry runs (week of Mar 17) TENTATIVE
  6. Final talks to Elke:Tue Mar 25
  7. Review: Mar 27 and 28
  8. issues that need special attention