Difference between revisions of "DC and PID Review"

From GlueXWiki
Jump to: navigation, search
(Added link to my talk on simulation/reconstruction)
Line 26: Line 26:
 
## Wednesday Mar 12
 
## Wednesday Mar 12
 
##* Talk 3 8:00 am Dan [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=997  FDC Design]  F326/327
 
##* Talk 3 8:00 am Dan [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=997  FDC Design]  F326/327
##* Talk 4 4:00 pm David  L207
+
##* Talk 4 4:00 pm David [http://argus.phys.uregina.ca/cgi-bin/private/DocDB/ShowDocument?docid=1000 Simulation/Reconstruction]   L207
 
## Thursday F326/327 Mar 13
 
## Thursday F326/327 Mar 13
 
##* Talk 2  9:00 am Yves
 
##* Talk 2  9:00 am Yves

Revision as of 13:55, 12 March 2008

Preparations for the Hall D DC and PID Final Design and Safety Review
Review: Mar 27 and 28

  1. Previous Reviews
  2. Mar 27-28 Review Documents (halld guest)
  3. Pre-brief Material. Due Mar 19 to reviewers.
  4. First round of dry runs (week of March 10)
    1. Monday L102/104 Mar 10
      • Talk 15 2:30pm Fernando
    2. Tuesday F326/327 Mar 11
    3. Wednesday Mar 12
    4. Thursday F326/327 Mar 13
      • Talk 2 9:00 am Yves
      • Talk 6 4:30 pm Elton
    5. Friday F326/327 Mar 14
      • Talk 7 8:00 am Eugene
      • Talk 1 10:00 am Curtis
  5. Second round of dry runs (week of Mar 17) TENTATIVE
  6. Final talks to Elke:Tue Mar 25
  7. Review: Mar 27 and 28
  8. issues that need special attention